Would something like this be useful?

--- develop.html.~1.114.~       2011-03-26 10:44:52.000000000 +0100
+++ develop.html        2011-03-26 10:58:49.311173994 +0100
@@ -434,13 +434,13 @@
        |                                   GCC 4.5.1 release (2010-07-31)
   GCC 4.6 Stage 3 (starts 2010-11-03)          \
        |                                        v
-       |                                   GCC 4.5.2 release (2010-12-16)
+       | r167945                           GCC 4.5.2 release (2010-12-16)
        |
        +-- GCC 4.6 branch created ------+
-       |                                 \
+       | r170934                         \
        v                                  v
   GCC 4.7 Stage 1 (starts 2011-03-14)      GCC 4.6.0 release (2011-03-25)
-       |
+       | r171512
        |
        v
 
The idea is to include the copy-source revision on the trunk or the
respective branch, so that you can use the timeline to check whether a
particular change came before or after a release.  Of course, this is
just an approximation, but it think it might still be useful.

Reply via email to