Oleg Endo <[email protected]> wrote: > Do you mean something like the attached patch as a preparation step? > (checked with 'make all')
Yes. The patch is OK with removing the first line of the ChangeLog
entry for PR number.
Regards,
kaz
Oleg Endo <[email protected]> wrote: > Do you mean something like the attached patch as a preparation step? > (checked with 'make all')
Yes. The patch is OK with removing the first line of the ChangeLog
entry for PR number.
Regards,
kaz