I have been selected as the General Area Review Team (Gen-ART)
reviewer for this draft. For background on Gen-ART, please see the FAQ at
<http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>
Please resolve these comments along with any other comments you may receive.
Document: draft-ietf-roll-minrank-hysteresis-of-10.txt
Reviewer: Miguel Garcia <[email protected]>
Review Date: 2012-05-08
IESG Telechat date: 2012-05-10
Summary: The document is ready for publication as a standards track RFC
Major issues: none
Minor issues: none
Nits/editorial comments:
I reviewed version -07 of this document. At that time, I had a few
editorial comments, and all of them but one have been addressed in
version -10. The comment that has not been address is included here again
for your consideration:
- Section 3.1. Towards the end of the section, the sentence reads:
The path cost corresponding to a neighbor SHOULD be re-computed each
time:
and then there are 3 conditions numbered from 1 to 3. It is not clear if
the path cost should be recomputed when all of the 3 conditions are met,
or when any of the 3 conditions are met. In other words, it is not clear
if the 3 bullet points are an "AND" or an "OR" operation among then.
Presumably they are an "OR". If this is the case, perhaps the sentence
should be rephrased as:
The path cost corresponding to a neighbor SHOULD be re-computed each
time any of the following conditions are met:
/Miguel
--
Miguel A. Garcia
+34-91-339-3608
Ericsson Spain
_______________________________________________
Gen-art mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/gen-art