I have been selected as the General Area Review Team (Gen-ART)
reviewer for this draft. For background on Gen-ART, please see the FAQ at
<http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>

Please resolve these comments along with any other comments you may receive.

Document: draft-ietf-roll-minrank-hysteresis-of-10.txt
Reviewer: Miguel Garcia <[email protected]>
Review Date: 2012-05-08
IESG Telechat date: 2012-05-10

Summary: The document is ready for publication as a standards track RFC

Major issues: none

Minor issues: none

Nits/editorial comments:

I reviewed version -07 of this document. At that time, I had a few editorial comments, and all of them but one have been addressed in version -10. The comment that has not been address is included here again for your consideration:

- Section 3.1. Towards the end of the section, the sentence reads:

   The path cost corresponding to a neighbor SHOULD be re-computed each
   time:

and then there are 3 conditions numbered from 1 to 3. It is not clear if the path cost should be recomputed when all of the 3 conditions are met, or when any of the 3 conditions are met. In other words, it is not clear if the 3 bullet points are an "AND" or an "OR" operation among then. Presumably they are an "OR". If this is the case, perhaps the sentence should be rephrased as:

   The path cost corresponding to a neighbor SHOULD be re-computed each
   time any of the following conditions are met:



/Miguel
--
Miguel A. Garcia
+34-91-339-3608
Ericsson Spain
_______________________________________________
Gen-art mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/gen-art

Reply via email to