Would it possible to reschedule brutus to run 4-6 hours later than the current configuration?


As things stand the window of opportunity between a notification from LSD and the startup of the brutus session is too small to get in commits - as such its near to impossible to leverage multiple runs within a single day.

Currently things are equivalent to:

  <-----------> <---->
       LSD      Brutus
  0--2--4--6--8--10--12--14--16--18--20--22--24


Pushing in a 4-6 hour delay would shift things to:


  <----------->       <---->
       LSD            Brutus
  0--2--4--6--8--10--12--14--16--18--20--22--24


This would provide two windows within a 24 hour period to check results and make updates (which would be twice as good).


WDYT?

Cheers, Steve.

--

|------------------------------------------------|
| Magic by Merlin                                |
| Production by Avalon                           |
|                                                |
| http://avalon.apache.org/merlin                |
| http://dpml.net/merlin/distributions/latest    |
|------------------------------------------------|

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]



Reply via email to