Would it possible to reschedule brutus to run 4-6 hours later than the current configuration?
As things stand the window of opportunity between a notification from LSD and the startup of the brutus session is too small to get in commits - as such its near to impossible to leverage multiple runs within a single day.
Currently things are equivalent to:
<-----------> <---->
LSD Brutus
0--2--4--6--8--10--12--14--16--18--20--22--24Pushing in a 4-6 hour delay would shift things to:
<-----------> <---->
LSD Brutus
0--2--4--6--8--10--12--14--16--18--20--22--24This would provide two windows within a 24 hour period to check results and make updates (which would be twice as good).
WDYT?
Cheers, Steve.
--
|------------------------------------------------| | Magic by Merlin | | Production by Avalon | | | | http://avalon.apache.org/merlin | | http://dpml.net/merlin/distributions/latest | |------------------------------------------------|
--------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
