Hello everyone. I am very impressed with Timeline from what I have seen. I am interested in using it for basic scheduling. There are a couple things that the software appears to not do that I¹d need. (1) I need to control which row Timeline displays a date span on, and I need to label the row. Imagine that the row represents a conference room that is to be reserved, and the date span is a reservation of that room. (2) The user needs to be able to drag a date span that is plotted left and right to adjust the schedule.
Could someone suggest to me how difficult implementing these changes would be? ~ David Smiley MITRE
_______________________________________________ General mailing list [email protected] http://simile.mit.edu/mailman/listinfo/general
