Hi there, 
 
First time here posting here, so let me congratulate you for the excellent work 
on timeline.
 
I'll still reading the documentation, so this may be a stupid question,  
whenever i load my 3 diferent xml files that cotains all events,  i get the 
following:
 
 
 
 
All the filles contain the same events, except file2 that i removed the second 
period, this way the second file  has no period in August.
I thought that by loading from different files i could  controll the index into 
which the events are plotted in  order to obtain the following:
 
 
 
 
but  instead the event in the third file goes up into the level of the second 
file.
 
Is there a way i can controll this?
 
Thank you for time and patiente
 
Valter Conceição

<<Outlook.jpg>>

<<Outlook.jpg>>

_______________________________________________
General mailing list
[email protected]
http://simile.mit.edu/mailman/listinfo/general

Reply via email to