Hi there, First time here posting here, so let me congratulate you for the excellent work on timeline. I'll still reading the documentation, so this may be a stupid question, whenever i load my 3 diferent xml files that cotains all events, i get the following: All the filles contain the same events, except file2 that i removed the second period, this way the second file has no period in August. I thought that by loading from different files i could controll the index into which the events are plotted in order to obtain the following: but instead the event in the third file goes up into the level of the second file. Is there a way i can controll this? Thank you for time and patiente Valter Conceição
<<Outlook.jpg>>
<<Outlook.jpg>>
_______________________________________________ General mailing list [email protected] http://simile.mit.edu/mailman/listinfo/general
