In reviewing the tickets and attempting to organize them by the criteria I mentioned earlier, I found many more tickets that seemed ambiguous to me than I expected. I have listed them below.
I think that based on our discussion earlier today, it would make a lot of sense to do an official community triage meeting on Monday to discuss these tickets (and any other issues about the scope anyone wants to raise). These were tickets that I thought I was making an independent judgment call when assigning to a milestone: http://projects.opengeo.org/CAPRA/ticket/599 http://projects.opengeo.org/CAPRA/ticket/543 http://projects.opengeo.org/CAPRA/ticket/450 http://projects.opengeo.org/CAPRA/ticket/431 http://projects.opengeo.org/CAPRA/ticket/495 http://projects.opengeo.org/CAPRA/ticket/550 http://projects.opengeo.org/CAPRA/ticket/628 http://projects.opengeo.org/CAPRA/ticket/494 http://projects.opengeo.org/CAPRA/ticket/452 http://projects.opengeo.org/CAPRA/ticket/426 http://projects.opengeo.org/CAPRA/ticket/391 http://projects.opengeo.org/CAPRA/ticket/542 I wasn't confident whether these tickets should be 1.0beta or 1.x: http://projects.opengeo.org/CAPRA/ticket/601 http://projects.opengeo.org/CAPRA/ticket/393 http://projects.opengeo.org/CAPRA/ticket/490 http://projects.opengeo.org/CAPRA/ticket/530 http://projects.opengeo.org/CAPRA/ticket/570 http://projects.opengeo.org/CAPRA/ticket/540 This seems to depend on a feature, style uploading, that doesn't exist and isn't ticketed. Not sure whether that was in the client-specified scope. Will look up: http://projects.opengeo.org/CAPRA/ticket/385 I think this issue we might try to negotiate our way out of implementing despite the client's request because it could delay the release: http://projects.opengeo.org/CAPRA/ticket/565 Made a UI design call here (whatever the UI decision is to solve the problem, I think the bug should be fixed by 1.0): http://projects.opengeo.org/CAPRA/ticket/644 http://projects.opengeo.org/CAPRA/ticket/478 Unclear what the scope is on this ticket: http://projects.opengeo.org/CAPRA/ticket/502 Batch Upload related. At this rate, it's not clear what the timeline on the batch uploading functionality is. It may need to be cut from 1.0: http://projects.opengeo.org/CAPRA/ticket/582 http://projects.opengeo.org/CAPRA/ticket/583 <http://projects.opengeo.org/CAPRA/ticket/495> -- Sebastian Benthall OpenGeo - http://opengeo.org
