Hi, I'm afraid I probably made a mistake when laying down the release dates for GeoServer and GeoTools under the time boxed release model here: http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule
The model was foreseeing 4 months open development, 2 months hardening, and then the release, with RC starting to get out at the end of the 6-th month and gettingout every two weeks until we were done. However the above timetable had only 3 months of open development, and we missed the first beta in december because of lack of volounteers. Hum... if we follow the current timetable, next month will be RC, and if we do a couple of those, we'll have 2.3.0 final right at the end of the 6 months cycle. Not bad, ad the cycle repeats itself two times in a year this way. Or... we can do another beta next month, release the first RC in two months, and probably have the final in three months Tangential topic, branching off, the time boxed relase model had a branch off by the second beta, but I agree with other people that having a trunk always open is probably better Opinions? Cheers Andrea -- == Our support, Your Success! Visit http://opensdi.geo-solutions.it for more information. == Ing. Andrea Aime @geowolf Technical Lead GeoSolutions S.A.S. Via Poggio alle Viti 1187 55054 Massarosa (LU) Italy phone: +39 0584 962313 fax: +39 0584 1660272 mob: +39 339 8844549 http://www.geo-solutions.it http://twitter.com/geosolutions_it ------------------------------------------------------- ------------------------------------------------------------------------------ Master Visual Studio, SharePoint, SQL, ASP.NET, C# 2012, HTML5, CSS, MVC, Windows 8 Apps, JavaScript and much more. Keep your skills current with LearnDevNow - 3,200 step-by-step video tutorials by Microsoft MVPs and experts. ON SALE this month only -- learn more at: http://p.sf.net/sfu/learnnow-d2d _______________________________________________ Geoserver-devel mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/geoserver-devel
