On Thu, Jun 28, 2012 at 5:01 PM, Rs deLima <[email protected]> wrote:
> Hi again,
>
> I'm managing with a huge amount of data 19.000.0000 of tiled images and a
> pyramid process is already started. I need to launch another pyramid
> process but if I try to open a second tab but it doesn't works properly.
As in, it does not open it? This is due to the configuration lock, the
GeoServer catalog is not thread safe so
any interaction with the GUI locks the GUI fully as long as the HTTP
request is going,
you cannot open other pages until it's done (since there is no way to tell
if a certain GUI interaction is ready
only or it's saving something).
The same happens with REST, but there we have a read/write lock, so you can
do multiple reads in parallel,
but if you are doing a write (adding somethign new) that takes a lot of
time, you'll get both the GUI
and the other REST calls locked for the whole time too.
I know it's not optimal, but before the lock it was way worse, with the
catalog getting corrupted irreparably
if two writes happened at the same time.
Cheers
Andrea
--
Ing. Andrea Aime
GeoSolutions S.A.S.
Tech lead
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 962313
mob: +39 339 8844549
http://www.geo-solutions.it
http://geo-solutions.blogspot.com/
http://www.youtube.com/user/GeoSolutionsIT
http://www.linkedin.com/in/andreaaime
http://twitter.com/geowolf
------------------------------------------------------------------------------
Live Security Virtual Conference
Exclusive live event will cover all the ways today's security and
threat landscape has changed and how IT managers can respond. Discussions
will include endpoint security, mobile security and the latest in malware
threats. http://www.accelacomm.com/jaw/sfrnl04242012/114/50122263/
_______________________________________________
Geoserver-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/geoserver-users