Ciao martin,
I was quikly looking at the evaluate method for GridCoverage2D and I
noticed that when trying to evaluate the coverage by providing a point
that is in a differenct coordinate reference system with respect to
the one of the coverage itself, we might have problems when the bursa
params are missing.
I guess the responsible is the toPoint2D method which creates
TransformedDirectPosition without any hints to control the referencing
factory it creates.

Should we open up a JIRA for this?


Ciao,
Simone.


-- 
-------------------------------------------------------
Eng. Simone Giannecchini
President /CEO GeoSolutions S.A.S.
Via Carignoni 51
55041  Camaiore (LU)
Italy

phone: +39 0584983027
fax:      +39 0584983027
mob:    +39 333 8128928


http://www.geo-solutions.it

-------------------------------------------------------

-------------------------------------------------------------------------
This SF.net email is sponsored by: Microsoft
Defy all challenges. Microsoft(R) Visual Studio 2008.
http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/
_______________________________________________
Geotools-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/geotools-devel

Reply via email to