See <http://hudson.opengeo.org/hudson/job/geotools-2.6.x/249/changes>

Changes:

[jive] GEOT-3014, allow h2 to clean up a prior database

------------------------------------------
[...truncated 13263 lines...]
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.006 sec
Running org.geotools.geometry.iso.util.algorithmND.AlgoPointNDTest
Tests run: 2, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.004 sec
Running org.geotools.geometry.iso.primitive.PicoPrimitiveFactoryTest
Tests run: 4, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.068 sec
Running org.geotools.geometry.iso.operations.CentroidTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.015 sec
Running org.geotools.geometry.iso.complex.CompositeSurfaceTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.004 sec
Running org.geotools.geometry.iso.primitive.PicoCurveTest
Tests run: 4, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.001 sec
Running org.geotools.geometry.iso.operations.IsSimpleOperationTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0 sec
Running org.geotools.geometry.iso.coordinate.LineStringLineSegmentTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.046 sec
Running org.geotools.geometry.iso.primitive.CurveTest
Tests run: 2, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: -0.002 sec
Running org.geotools.geometry.iso.coordinate.PicoEnvelopeTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.003 sec
Running org.geotools.geometry.iso.operations.SetOperationsTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.118 sec
Running org.geotools.geometry.iso.coordinate.PicoDirectPositionTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.003 sec
Running org.geotools.geometry.iso.coordinate.EnvelopeTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.004 sec
Running org.geotools.geometry.iso.coordinate.PicoGeometryFactoryTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.004 sec
Running org.geotools.geometry.iso.util.Circle2DTest
Tests run: 4, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.006 sec
Running org.geotools.geometry.iso.operations.RelateOperatorsTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.128 sec
Running org.geotools.geometry.iso.coordinate.PicoLineStringLineSegmentTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0 sec
Running org.geotools.geometry.iso.operations.ClosureTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.002 sec
Running org.geotools.geometry.iso.primitive.BoundaryTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.002 sec
Running org.geotools.geometry.iso.primitive.RingTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.002 sec

Results :

Tests run: 72, Failures: 0, Errors: 0, Skipped: 0

[INFO] [jar:jar]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/geometry/target/gt-geometry-2.6-SNAPSHOT.jar>
[INFO] Preparing source:jar
[WARNING] Removing: jar from forked lifecycle, to prevent recursive invocation.
[INFO] No goals needed for project - skipping
[INFO] [source:jar {execution: attach-sources}]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/geometry/target/gt-geometry-2.6-SNAPSHOT-sources.jar>
[INFO] [jar-collector:collect {execution: default}]
[INFO] [install:install]
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/geometry/target/gt-geometry-2.6-SNAPSHOT.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-geometry/2.6-SNAPSHOT/gt-geometry-2.6-SNAPSHOT.jar
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/geometry/target/gt-geometry-2.6-SNAPSHOT-sources.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-geometry/2.6-SNAPSHOT/gt-geometry-2.6-SNAPSHOT-sources.jar
[INFO] ------------------------------------------------------------------------
[INFO] Building Temporal implementation
[INFO]    task-segment: [clean, install]
[INFO] ------------------------------------------------------------------------
[INFO] [clean:clean]
[INFO] Deleting directory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target>
[INFO] [resources:resources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] skip non existing resourceDirectory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/src/main/resources>
[INFO] [compiler:compile]
[INFO] Compiling 24 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/classes>
[INFO] [resources:testResources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] skip non existing resourceDirectory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/src/test/resources>
[INFO] [compiler:testCompile]
[INFO] Compiling 22 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/test-classes>
[INFO] [surefire:test]
[INFO] Surefire report directory: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/surefire-reports>

-------------------------------------------------------
 T E S T S
-------------------------------------------------------
Running org.geotools.temporal.object.DefaultCalendarDateTest
Tests run: 7, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.093 sec
Running org.geotools.temporal.reference.DefaultCalendarTest
Tests run: 10, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.05 sec
Running org.geotools.temporal.object.DefaultTemporalGeometricPrimitiveTest
Tests run: 3, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.011 sec
Running org.geotools.temporal.reference.DefaultTemporalReferenceSystemTest
Tests run: 14, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.047 sec
Running org.geotools.temporal.reference.DefaultCalendarEraTest
Tests run: 14, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.042 sec
Running org.geotools.temporal.reference.DefaultClockTest
Tests run: 12, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.034 sec
Running org.geotools.temporal.object.DefaultTemporalPrimitiveTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.004 sec
Running org.geotools.temporal.object.DefaultInstantTest
Tests run: 10, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.018 sec
Running org.geotools.temporal.object.DefaultDateAndTimeTest
Tests run: 9, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.02 sec
Running org.geotools.temporal.object.DefaultOrdinalPositionTest
Tests run: 5, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.016 sec
Running org.geotools.temporal.reference.DefaultTemporalCoordinateSystemTest
Tests run: 9, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.022 sec
Running org.geotools.temporal.object.DefaultPeriodDurationTest
Tests run: 18, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.061 sec
Running org.geotools.temporal.object.DefaultPeriodTest
Tests run: 9, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.022 sec
Running org.geotools.temporal.object.DefaultClockTimeTest
Tests run: 5, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.023 sec
Running org.geotools.temporal.object.DefaultIntervalLengthTest
Tests run: 7, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.045 sec
Running org.geotools.temporal.reference.DefaultOrdinalReferenceSystemTest
Tests run: 5, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: -0.003 sec
Running org.geotools.temporal.reference.DefaultOrdinalEraTest
Tests run: 12, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.015 sec
Running org.geotools.temporal.object.DefaultTemporalCoordinateTest
Tests run: 5, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.008 sec
Running org.geotools.temporal.object.DefaultPositionTest
Tests run: 7, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.012 sec
Running org.geotools.temporal.object.DefaultTemporalPositionTest
Tests run: 7, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.009 sec

Results :

Tests run: 169, Failures: 0, Errors: 0, Skipped: 0

[INFO] [jar:jar]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/gt-temporal-2.6-SNAPSHOT.jar>
[INFO] Preparing source:jar
[WARNING] Removing: jar from forked lifecycle, to prevent recursive invocation.
[INFO] No goals needed for project - skipping
[INFO] [source:jar {execution: attach-sources}]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/gt-temporal-2.6-SNAPSHOT-sources.jar>
[INFO] [jar-collector:collect {execution: default}]
[INFO] [install:install]
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/gt-temporal-2.6-SNAPSHOT.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-temporal/2.6-SNAPSHOT/gt-temporal-2.6-SNAPSHOT.jar
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/temporal/target/gt-temporal-2.6-SNAPSHOT-sources.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-temporal/2.6-SNAPSHOT/gt-temporal-2.6-SNAPSHOT-sources.jar
[INFO] ------------------------------------------------------------------------
[INFO] Building Process
[INFO]    task-segment: [clean, install]
[INFO] ------------------------------------------------------------------------
[INFO] [clean:clean]
[INFO] Deleting directory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target>
[INFO] [resources:resources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] Copying 1 resource
[INFO] [compiler:compile]
[INFO] Compiling 38 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/classes>
[INFO] [resources:testResources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] Copying 1 resource
[INFO] [compiler:testCompile]
[INFO] Compiling 4 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/test-classes>
[INFO] [surefire:test]
[INFO] Surefire report directory: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/surefire-reports>

-------------------------------------------------------
 T E S T S
-------------------------------------------------------
Running org.geotools.process.raster.VectorToRasterProcessTest
process
Tests run: 2, Failures: 0, Errors: 0, Skipped: 1, Time elapsed: 0.898 sec
Running org.geotools.process.literal.ProcessTest
Tests run: 4, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.102 sec
Running org.geotools.process.feature.BufferFeatureCollectionProcessTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.044 sec
Running org.geotools.process.raster.RasterToVectorProcessTest
   convert simple raster
   test conversion with holes
   test conversion with no outside values
   convert problem image
Tests run: 4, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.416 sec

Results :

Tests run: 11, Failures: 0, Errors: 0, Skipped: 1

[INFO] [jar:jar]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/gt-process-2.6-SNAPSHOT.jar>
[INFO] Preparing source:jar
[WARNING] Removing: jar from forked lifecycle, to prevent recursive invocation.
[INFO] No goals needed for project - skipping
[INFO] [source:jar {execution: attach-sources}]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/gt-process-2.6-SNAPSHOT-sources.jar>
[INFO] [jar-collector:collect {execution: default}]
[INFO] [install:install]
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/gt-process-2.6-SNAPSHOT.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-process/2.6-SNAPSHOT/gt-process-2.6-SNAPSHOT.jar
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/process/target/gt-process-2.6-SNAPSHOT-sources.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-process/2.6-SNAPSHOT/gt-process-2.6-SNAPSHOT-sources.jar
[INFO] ------------------------------------------------------------------------
[INFO] Building Web Processing Service
[INFO]    task-segment: [clean, install]
[INFO] ------------------------------------------------------------------------
[INFO] [clean:clean]
[INFO] Deleting directory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target>
[INFO] [resources:resources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] skip non existing resourceDirectory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/src/main/resources>
[INFO] [compiler:compile]
[INFO] Compiling 23 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/classes>
[INFO] [resources:testResources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] Copying 1 resource
[INFO] [compiler:testCompile]
[INFO] Compiling 3 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/test-classes>
[INFO] [surefire:test]
[INFO] Tests are skipped.
[INFO] [jar:jar]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/gt-wps-2.6-SNAPSHOT.jar>
[INFO] Preparing source:jar
[WARNING] Removing: jar from forked lifecycle, to prevent recursive invocation.
[INFO] No goals needed for project - skipping
[INFO] [source:jar {execution: attach-sources}]
[INFO] Building jar: 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/gt-wps-2.6-SNAPSHOT-sources.jar>
[INFO] [jar-collector:collect {execution: default}]
[INFO] [install:install]
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/gt-wps-2.6-SNAPSHOT.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-wps/2.6-SNAPSHOT/gt-wps-2.6-SNAPSHOT.jar
[INFO] Installing 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/wps/target/gt-wps-2.6-SNAPSHOT-sources.jar>
 to 
/home/tomcat/.m2/repository/org/geotools/gt-wps/2.6-SNAPSHOT/gt-wps-2.6-SNAPSHOT-sources.jar
[INFO] ------------------------------------------------------------------------
[INFO] Building EPSG Authority Service using H2 database
[INFO]    task-segment: [clean, install]
[INFO] ------------------------------------------------------------------------
[INFO] [clean:clean]
[INFO] Deleting directory 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/epsg-h2/target>
[INFO] [resources:resources]
[INFO] Using 'UTF-8' encoding to copy filtered resources.
[INFO] Copying 7 resources
[INFO] [compiler:compile]
[INFO] Compiling 3 source files to 
<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/epsg-h2/target/classes>
[INFO] ------------------------------------------------------------------------
[ERROR] BUILD FAILURE
[INFO] ------------------------------------------------------------------------
[INFO] Compilation failure

<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/epsg-h2/src/main/java/org/geotools/referencing/factory/epsg/DatabaseCreationScript.java>:[61,21]
 cannot find symbol
symbol  : method setWritable(boolean,boolean)
location: class java.io.File

<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/epsg-h2/src/main/java/org/geotools/referencing/factory/epsg/DatabaseCreationScript.java>:[65,24]
 cannot find symbol
symbol  : method setWritable(boolean,boolean)
location: class java.io.File

<http://hudson.opengeo.org/hudson/job/geotools-2.6.x/ws/gt_2.6.x/modules/unsupported/epsg-h2/src/main/java/org/geotools/referencing/factory/epsg/DatabaseCreationScript.java>:[69,19]
 cannot find symbol
symbol  : method setWritable(boolean,boolean)
location: class java.io.File


[INFO] ------------------------------------------------------------------------
[INFO] For more information, run Maven with the -e switch
[INFO] ------------------------------------------------------------------------
[INFO] Total time: 12 minutes 9 seconds
[INFO] Finished at: Mon Mar 29 09:26:02 EDT 2010
[INFO] Final Memory: 57M/148M
[INFO] ------------------------------------------------------------------------


------------------------------------------------------------------------------
Download Intel&#174; Parallel Studio Eval
Try the new software tools for yourself. Speed compiling, find bugs
proactively, and fine-tune applications for parallel performance.
See why Intel Parallel Studio got high marks during beta.
http://p.sf.net/sfu/intel-sw-dev
_______________________________________________
Geotools-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/geotools-devel

Reply via email to