Harald Welte has posted comments on this change. ( 
https://gerrit.osmocom.org/10701 )

Change subject: lchan: pick proper power and ta values
......................................................................


Patch Set 1: Code-Review-1

(1 comment)

https://gerrit.osmocom.org/#/c/10701/1//COMMIT_MSG
Commit Message:

https://gerrit.osmocom.org/#/c/10701/1//COMMIT_MSG@18
PS1, Line 18: For the power,TA levels, take over an old lchan's values only 
when it is
            :   assigning a new lchan in the same cell.
this doesn't make sense, sorry. The process of establishing the new radio 
channel in asynchronous hand-over with the RACH bursts exists exactly to 
determine the TA value of the new channel.  Copying TA from the old lchan only 
makes sense if the old lchan is in the same *BTS*.  A diferent BTS managed by 
the same BSC will normally be at a completely different geographical location 
and you cannot make any assumption on the TA.  Hence the async hand-over....

regarding power levels, I would always start with the hghest power level 
possible/permitted. the power control loop will then ramp down to whatever is 
sufficient.



--
To view, visit https://gerrit.osmocom.org/10701
To unsubscribe, or for help writing mail filters, visit 
https://gerrit.osmocom.org/settings

Gerrit-Project: osmo-bsc
Gerrit-Branch: master
Gerrit-MessageType: comment
Gerrit-Change-Id: I360b003398487fa6f934296ff03643c33ec61a35
Gerrit-Change-Number: 10701
Gerrit-PatchSet: 1
Gerrit-Owner: Neels Hofmeyr <[email protected]>
Gerrit-Reviewer: Harald Welte <[email protected]>
Gerrit-Reviewer: Jenkins Builder (1000002)
Gerrit-Comment-Date: Thu, 30 Aug 2018 12:49:19 +0000
Gerrit-HasComments: Yes
Gerrit-HasLabels: Yes

Reply via email to