Amar Tumballi <atumb...@redhat.com> wrote:

> Would be great to have an option to submit regression run 
> with multiple patch numbers,

You can have two kind of tests: one set that is short and run
indivdually for each patch, and the other that is much longer, and runs
master branch contiously with a bunch of new patches each tilme.

FWIW, the NetBSD project only has the second set, since just a full
build of 6 M LoC (which you need before starting regression tests) takes
more than a hour, and we have more than 24 commits each day.

That second set could include very long tests, which catch bugs that do
not show immediatly (memory leaks, race conditions...)

-- 
Emmanuel Dreyfus
http://hcpnet.free.fr/pubz
m...@netbsd.org

_______________________________________________
Gluster-devel mailing list
Gluster-devel@nongnu.org
https://lists.nongnu.org/mailman/listinfo/gluster-devel

Reply via email to