Pranith Kumar Karampuri <[email protected]> wrote:

> I tried to look into 3 instances of this failure:
(...)
> same issue as above, two tests are running in parallel.

How is it possible? A & that sends a job in the background?
Are we sure it is the same regression test run? Or is it two regression
test runs that are scheduled simultaneously?

-- 
Emmanuel Dreyfus
http://hcpnet.free.fr/pubz
[email protected]
_______________________________________________
Gluster-infra mailing list
[email protected]
http://www.gluster.org/mailman/listinfo/gluster-infra

Reply via email to