Starting build process at Wed 10/07/2015 - 12:00:07.04
   * Cleaning up old build (12:00:07.04)...
     Cleanup was successful
   * Checking out the code (12:41:41.79)...
     Checkout was successful
   * Compiling GMAT (12:44:23.24)...
     Compilation was successful
   * Creating user docs (14:18:16.63)...
     User documentation build was successful
   * Creating dev docs (14:28:31.61)...
     Developer documentation build was successful
   * Assembling Daily Distribution (14:33:00.51)...
     GMAT executable distribution was successfully assembled
   * Assembling Latest Developer Docs Distribution (14:39:03.77)...
     Latest developer documentation distributable was successfully assembled
Stopping build process at Wed 10/07/2015 - 14:59:03.30


------------------------------------------------------------------------------
Full-scale, agent-less Infrastructure Monitoring from a single dashboard
Integrate with 40+ ManageEngine ITSM Solutions for complete visibility
Physical-Virtual-Cloud Infrastructure monitoring from one console
Real user monitoring with APM Insights and performance trend reports 
Learn More http://pubads.g.doubleclick.net/gampad/clk?id=247754911&iu=/4140
_______________________________________________
Gmat-buildtest mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/gmat-buildtest

Reply via email to