Dear gromac users,

I submitted my NPT run into a MPI cluster. The size of my run system is an 
85x85x85 box filled with water solvent. and I set NPT steps to be 1000000 
(1million) with dt 0.02. The log says It will finish sometime in mid or towards 
end of february. 

Is that normal for a NPT run of that size? Or am I just faced with slow 
technology. Or am I doing something wrong (I requested 6 cores for my run) 
Please let me know, thanks. 

Xu Dong Huang
Chemical & Biochemical Engineering
Rutgers School of Engineering 
[email protected] 

--
gmx-users mailing list    [email protected]
http://lists.gromacs.org/mailman/listinfo/gmx-users
* Please search the archive at 
http://www.gromacs.org/Support/Mailing_Lists/Search before posting!
* Please don't post (un)subscribe requests to the list. Use the
www interface or send it to [email protected].
* Can't post? Read http://www.gromacs.org/Support/Mailing_Lists

Reply via email to