We have multiple build agents that are capable of building in a single 
pipeline say Program A. Since we have multiple build agents, is there a way 
to have the same pipeline build multiple versions at the same time. ex 
Pipeline for Program A builds 1.1.0.1 and 1.1.0.2 at the same time. The 
reason for this is when multiple programmers are committing changes it 
allows us to break up the changes so we can more easily narrow down an 
issue if there is one. 

Basically we want multiple builds running at the same time in the same 
pipeline in the starting build stage, so if a new build needs to be started 
while one is currently building, it starts in the same pipeline. 

-- 
You received this message because you are subscribed to the Google Groups 
"go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to