Sorry, I got your names flipped around. On Monday, February 27, 2017 at 11:53:08 AM UTC-8, [email protected] wrote: > > You are right Mahesh. Will disabling the "Clean Working Directory" cause > old files to be left behind if it no longer exist in the source repository? > I will give it a try but my wish it to have a configurable property where > I can set the number of concurrent threads to serve this fetching. > I am also curious where this code resides. > > Thank you Mahesh and Ashwanth for replying. > > Thanks, > Keith > > On Sunday, February 26, 2017 at 11:51:21 PM UTC-8, Ashwanth Kumar wrote: >> >> I don't think he means the MDU Thread(s) but fetch process that happens >> as part of the preparing phase of a stage in a pipeline. Keith correct me >> If I'm wrong. >> >> The SCM materials that get's checked out as part of the stage prep phase >> gets cloned (or) updated in a sequential manner isn't? Given the logs are >> also displayed in a sequence on the console.log. I'm curious though, is >> there a way we can make it parallel? >> >> Keith, To reduce the material update process may be you can try disabling >> the "Clean Working Directory" on the given stage so Go need not fetch all >> materials over and over again when it gets scheduled on the same agent. It >> might reduce the time a little (based on a number of factors like how many >> materials get's updated for a single trigger of the pipeline, the lifetime >> of the agent etc.) >> >> >> On Mon, Feb 27, 2017 at 9:47 AM, Mahesh Panchakasahriah < >> [email protected]> wrote: >> >>> Hello, >>> >>> Material updates are not sequential, rather there are 10 threads to >>> handle updates at a given point of time. The number of threads can be >>> configured through the System Property *material.check.threads *which >>> defaults to 10. >>> >>> Why do you think the updates are sequential, are you facing any issues >>> with the material update? >>> >>> Thanks, >>> Mahesh >>> >>> On Saturday, February 25, 2017 at 12:18:17 AM UTC+5:30, >>> >>>> My pipeline has a list of greater than 20 materials, I am seeing that >>>> Go I fetching these materials one after another. Is there a way that I >>>> can >>>> make these fetches concurrent? >>>> What other solutions you might have to shorten the fetch process. >>>> Thanks, >>>> Keith >>>> >>>> -- >>> You received this message because you are subscribed to the Google >>> Groups "go-cd" group. >>> To unsubscribe from this group and stop receiving emails from it, send >>> an email to [email protected]. >>> For more options, visit https://groups.google.com/d/optout. >>> >> >> >> >> -- >> >> Ashwanth Kumar / ashwanthkumar.in >> >>
-- You received this message because you are subscribed to the Google Groups "go-cd" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
