Hi All, i want to give some 1 hour time gap between 2 pipelines/stages. can this be possible without using sleep as i do not want my agent to engage for this time duration.
-- You received this message because you are subscribed to the Google Groups "go-cd" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/go-cd/4f23bf57-027c-4913-b73e-3174cfeef0f3n%40googlegroups.com.
