----------------------------------------------------------------
Documented by Goa Desc Resource Centre (GDRC)
Email: [EMAIL PROTECTED]
---------------------------------------------------------------
-----------------------------------------------------
Govt sets in motion expressway marking
-----------------------------------------------------
The government appears firm on the 6-lane expressway
connecting Canacona and Pernem, with the PWD NH-17
setting in motion the preliminary process of marking the
alignment.

Colourful boards showing alignments of the proposed
expressway have sprung up in South Goa, on roadside in
the villages of Assolna, Chinchinim, Balli etc.

In fact, PWD officials have fanned out to the villages to supervise
erection of the boards, considered a first step towards finalising
the alignment.

Incidentally, the expressway is proposed through areas falling
within 200 mts to 1-2 kms away, west of the existing national
highway No 17.

Take Chinchinim for instance. The existing NH-17 passes through
Dandeavaddo area, but if one goes by the board erected at Sucaldem,
the expressway will pass through Deussua and join Sucaldem near
a shrimp farm, before joining Assolna in Banda and Adi-Banda
in Cuncolim.

Incidentally, the road passing through Deussua and Sucaldem falls
in khazan land, while at other places the alignment is mooted through
the low-lying paddy fields.

At Balli, the expressway alignment is located 800 mts on the Balli
-Fatorpa road, PWD officials said, adding the alignment passes
through Sinquetim-Navelim and the Utorda road junction.

When contacted, PWD Executive Engineer, NH-17 Gurav said the
erection of the boards on the proposed expressway alignment is
just a preliminary exercise. "The PWD will work out a feasible
alignment only after a thorough study. Nothing is final", he said.

Gurav said the PWD will undertake a study on the alignment on
the technical, economical and feasibility aspects of the propose
alignment. "We will study whether the alignment will affect human
habitation, and whether it requires any changes", adding that the
government will invite suggestions and objections from the public
before finalising the alignment.

The expressway had come in for strong criticism from some
quarters in Salcete, on grounds that the project would affect
human habitation on a large scale.
------------------------------------
HERALD 17/06/06  page 1
-----------------------------------

=======================================
GOA DESC RESOURCE CENTRE
Documentation + Education + Solidarity
11 Liberty Apts., Feira Alta, Mapusa, Goa 403 507
mailto:[EMAIL PROTECTED]
----------------------------------------------------------------------
Working On Issues Of Development & Democracy
=======================================


--
No virus found in this outgoing message.
Checked by AVG Anti-Virus.
Version: 7.1.394 / Virus Database: 268.9.0/368 - Release Date: 6/16/2006



_____________________________________________
Do not post admin requests to the list.
Goanet mailing list      ([email protected])

Reply via email to