One possible reason for the traffic jams along the Highway from Porvorim to 
Margao was the random road widening at various places along the route. Whenever 
space was available some road widening was undertaken. So a single lane turned 
into a multiple one in the section where the widening occured, but returned, 
sooner or later, to it's single lane status. At the best of times as many four, 
three and two wheeler vehicles try to squeeze into a single lane. So from 
supposed to having a single car occupying in the width of the road you had 
three or four cars in the widened section and all these having to squeeze back 
into a car per the road width later on. This was a cause of the clog-ups snd 
the solution costed millions of rupees in the construction of the new 
flyover/bridge system along the highway.
Now at the Porvorim end of the new Flyover cum Bridge, just before reaching the 
new construction there is a straightforward bifurcation for the traffic wanting 
to proceed straight over the new edifice or to that that has to turn left to 
head for Panjim via the two older bridges. But there was some small stretch of 
land available just after this bifurcation. This has now been used to construct 
another slipway road to head left to Panjim. So one can either turn left at the 
main bifurcation or wait a few seconds and turn left at the new slip road, 
hopefully not crashing into the vehicles that have already turned left a few 
seconds earlier at the main bifurcation!  

Reply via email to