Hi, can you prepare a simple page that reconstruct you problem? On Wed, Feb 9, 2011 at 8:18 AM, Wells Oliver <[email protected]> wrote:
> I see a bug, or maybe it's just shoddy work on my part: I have three > lines running on a timeline. Two of them run the length of the time > shown (2 year span), but one is only six months. This shorter line > seems to corrupt the visualization: the ranger selector shows a graph > of only the shortest line, with white space all around it (where there > should be a graph of the longer two lines). Additionally, the date > display in the graph will only display the proper date when putting > your mouse over points that fall within the three lines (so the > shorter, six month period). > > Any tips? > > -- > You received this message because you are subscribed to the Google Groups > "Google Visualization API" group. > To post to this group, send email to > [email protected]. > To unsubscribe from this group, send email to > [email protected]. > For more options, visit this group at > http://groups.google.com/group/google-visualization-api?hl=en. > > -- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/google-visualization-api?hl=en.
