Hi, can you prepare a simple page that reconstruct you problem?

On Wed, Feb 9, 2011 at 8:18 AM, Wells Oliver <[email protected]> wrote:

> I see a bug, or maybe it's just shoddy work on my part: I have three
> lines running on a timeline. Two of them run the length of the time
> shown (2 year span), but one is only six months. This shorter line
> seems to corrupt the visualization: the ranger selector shows a graph
> of only the shortest line, with white space all around it (where there
> should be a graph of the longer two lines). Additionally, the date
> display in the graph will only display the proper date when putting
> your mouse over points that fall within the three lines (so the
> shorter, six month period).
>
> Any tips?
>
> --
> You received this message because you are subscribed to the Google Groups
> "Google Visualization API" group.
> To post to this group, send email to
> [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/google-visualization-api?hl=en.
>
>

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/google-visualization-api?hl=en.

Reply via email to