Our backend collects data from different devices and stores them into a 
database. They also have an endpoint which I call from my frontend app. The 
data can be range of days or hours in order, For example Sept 1 to Sept 31 
range or from 12am to 11pm. There are times that their job isn't able to 
collect anything. It wouldn't store any data. There can be many factors 
like network issues, etc. As a result, the data I would get is like the one 
below. I'm using AreaChart type to display it. I see a gap on the chart but 
they are connected. What the product owner would like to see is not display 
the connecting line from 2am to 5am and also 7am to 9am, etc if there are 
more missing hours. Is this possible with Google Chart? Thanks!

12am
1am
2am
5am
6am
7am
9am
10am
11am
12pm and so on

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/google-visualization-api.
For more options, visit https://groups.google.com/d/optout.

Reply via email to