Hi, 
I 'd like to call google chart more than once by changing the data from a 
dropdown list. I called Google Chart as a widget including AppAsset that 
call 'js/loader.js' in Yii2.I used the latest version of Google Chart But I 
got this error when I change the dropdown list item:

Uncaught Error: google.charts.load() cannot be called more than once with 
version 44 or earlier.

and loader.js is not reloading, as a result the chart area is empty.  
How can I fix this problem? 

Thanks, 
Sahra 

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to google-visualization-api+unsubscr...@googlegroups.com.
To post to this group, send email to google-visualization-api@googlegroups.com.
Visit this group at https://groups.google.com/group/google-visualization-api.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/google-visualization-api/8be7fc60-c988-4622-9c46-8e6b0c96fdf3%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to