Hi all, I have a question about a problem I am having with the gantt chart. I am trying to create a chart within google with no dependencies. When put into google, Google re-sorts the dependencies if the dates aren’t corresponding. The results are that the order of resources are rearranged according to the dates. I attached a Word document to this message, were you can see what I mean. The first and above chart is the start situation, the second picture is the resullt of a data change in the recourse: 3.1 Fase 1 (2017). As you can see, the recource 3.1 is moved up in between the numbers 1.2 and 1.3. This is not the desired result. I need the chart to keep the original order of resources and the dependencies to be flexible and not follow corresponding dates. Is there a solution for this problem?
Regards, Richard vd Broek -- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/google-visualization-api. To view this discussion on the web visit https://groups.google.com/d/msgid/google-visualization-api/b142531c-1608-496a-832d-6eb0be3fdc65%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.
printscreens change data Gantt Chart.docx
Description: MS-Word 2007 document
