#71: portable HERON ETL for Epic
-------------------------+-----------------------
Reporter: dconnolly | Owner: bos
Type: enhancement | Status: assigned
Priority: major | Milestone:
Component: etl-dev | Resolution:
Keywords: | Blocked By: 127
Blocking: |
-------------------------+-----------------------
Changes (by dconnolly):
* owner: dconnolly => bos
* status: accepted => assigned
Comment:
In the 26 Aug call (#12) UTHSCSA reported they're working on integration.
--
Ticket URL:
<http://informatics.gpcnetwork.org/trac/Project/ticket/71#comment:10>
gpc-informatics <http://informatics.gpcnetwork.org/>
Greater Plains Network - Informatics
_______________________________________________
Gpc-dev mailing list
[email protected]
http://listserv.kumc.edu/mailman/listinfo/gpc-dev