#345: rfe: shorten default timeline horizon
-------------------------+--------------------------------------------------
 Reporter:  hamish       |       Owner:  [email protected]
     Type:  enhancement  |      Status:  new                      
 Priority:  minor        |   Milestone:  Website                  
Component:  Website      |     Version:  unspecified              
 Keywords:               |    Platform:  Unspecified              
      Cpu:  Unspecified  |  
-------------------------+--------------------------------------------------
 Hi,

 minor trac system wish wrt https://trac.osgeo.org/grass/timeline

 Is it possible to adjust the trac config so it looks back 3 days instead
 of 30? We have enough activity that 30 days is a lot of commits. It slows
 down the page download considerably, old news is uninteresting, you can
 easily manually adjust it if you want to look longer, and I would guess is
 a burden on the server as well.

 the current timeline.htm is 176k. If I set the timeframe to 3 days it
 reduces to 20k.



 paying by the mb at the far end of a wet piece of string,

 Hamish

-- 
Ticket URL: <https://trac.osgeo.org/grass/ticket/345>
GRASS GIS <http://grass.osgeo.org>
_______________________________________________
grass-dev mailing list
[email protected]
http://lists.osgeo.org/mailman/listinfo/grass-dev

Reply via email to