#345: rfe: shorten default timeline horizon -------------------------+-------------------------------------------------- Reporter: hamish | Owner: [email protected] Type: enhancement | Status: new Priority: minor | Milestone: Website Component: Website | Version: unspecified Keywords: | Platform: Unspecified Cpu: Unspecified | -------------------------+-------------------------------------------------- Hi,
minor trac system wish wrt https://trac.osgeo.org/grass/timeline Is it possible to adjust the trac config so it looks back 3 days instead of 30? We have enough activity that 30 days is a lot of commits. It slows down the page download considerably, old news is uninteresting, you can easily manually adjust it if you want to look longer, and I would guess is a burden on the server as well. the current timeline.htm is 176k. If I set the timeframe to 3 days it reduces to 20k. paying by the mb at the far end of a wet piece of string, Hamish -- Ticket URL: <https://trac.osgeo.org/grass/ticket/345> GRASS GIS <http://grass.osgeo.org>
_______________________________________________ grass-dev mailing list [email protected] http://lists.osgeo.org/mailman/listinfo/grass-dev
