[In the first article an interesting and plausible argument has been
put forward as regards the applicability of the Cl. 17(b) of the Act,
independent of the Cl. 17(a) and the Rule 24, and thereby suggests
enhancement of the Operator's 'right of recourse' vis-a-vis the
Supplier as compared to that interpreted by A Gopalakrishnan (in the
second article).]

I/II.
http://pxvlaw.wordpress.com/2011/11/20/right-of-recourse-interpretation-under-civil-liability-for-nuclear-damage-rules/

Right of Recourse: Interpretation Under Civil Liability for Nuclear Damage Rules

Posted on November 20, 2011

Mohit Abraham

First posted on the Nuclear Law and Policy India Blog , November 19, 2011

The much awaited The Civil Liability for Nuclear Damage Rules, 2011
(The “Rules”) are now in place to implement the provisions of the
Civil Liability for Nuclear Damage Act, 2010 (The “Act”).
Interestingly, the Act and the Rule has come into force (notified) on
the same day i.e., 11 November 2011. Undoubtedly, there has been an
intense lobbying from various supplier countries to dilute some of the
critical and unique provisions of the Indian Liability Act. An
analysis of the Rules provides an insight in both placating supplier
countries and also the attempt in retaining stringent provisions in
the Act.

Right of Recourse under Rule 24 is one such Rule that needs a broader
debate. The following note explains Rule 24 and its possible
interpretation. This note limits itself to interpretation of Rule 24
read with S 17 (a), (b), (c) of the Act.

    Rule 24 sub-rule 1 of the Rules provides that a contract referred
to in clause (a) of Section 17 of the Act, shall include a provision
for right of recourse for not less than the extent of the operators
liability provided under Section 6(2) of the Act or the value of the
contract itself, whichever is less.
    Further, sub-rule 2 of Rule 24 provides that the provision for a
right of recourse referred to in sub-rule 1 of Rule 24 shall be for
the duration of initial license issued under the Atomic Energy
(Radiation Protection) Rules 2004, or the product liability period
whichever is longer. Therefore, sub-rule 2 also refers to only the
right of recourse provided under Section 17(a) and not section 17(b)
and 17(c). The Rules then go on to explain what is “product liability
period” and “supplier”.
    A key issue of interpretation arises here. Section 17 of the Civil
Liability Act states that the operators shall have a right of recourse
where; a) such right is expressly provided for in a contract in
writing; b) the nuclear incident has resulted as a consequence of an
act of supplier or his employee, which includes supply of equipment or
material with patent or latent defects or sub-standard services; c)
the nuclear incident has resulted from the act of commission or
omission of an individual done with the intent to cause nuclear
damage.

The present Rule 24 appears to confine itself to the provision of
Section 17(a) alone. Sub sections 17 (b) and (c) do not appear to be
covered at all. This interpretation of course proceeds on the basis
that sub-sections 17(a), (b) and (c) are distinctive, i.e. the right
of recourse applies where the situations referred to in 17(a) or (b)
or (c) are fulfilled.

Therefore, the confinement of the liability to a specific time period,
i.e the duration of initial license issued under the Atomic Energy
(Radiation Protection) Rules (about 5 years) or the product liability
period, would work only when the right of recourse is expressly
provided for in a contract in writing, i.e Rule 17(a).

This may work out in practice as follows: Assume a contract is entered
into between the operator and the supplier in which the warranty
provided by the supplier for a product is for 5 years. Accordingly, in
terms of Rule 24, the right of recourse by the operator against the
supplier would apply for 5 years. During the course of 5 years, any
damage caused owing to material defect of the particular product would
attract the right of recourse clause. After 3 years, the supplier is
no longer liable and no right of recourse would apply.

However, after a period of 5 years, in terms of Section 17(b), if the
operator could show that a nuclear incident has resulted as a
consequence of an act of a supplier or his employee, which includes
supply of equipment or material with patent or latent defects or
sub-standard services (as opposed to normal wear and tear), the right
of recourse would be of no avail, and the supplier could be made
liable.

Therefore, it could be strongly argued that if a nuclear incident
results directly as a consequences of an act of a supplier or his
employee, this limitation on liability provided in the Rules would not
apply.

It if was the intention of the Central Government to limit the time
period of liability to all situations, the existing Rules do not
appear to do so. They only apply to situations where the right of
recourse is provided for in a contract in writing.

Separately, Section 46 of the Act states that the Act shall be in
addition to, and not in derogation of any other law. Therefore,
technically, an individual affected by a nuclear incident would be
within his rights to move an action in tort against a supplier
notwithstanding any contract between the supplier and the operator
since there is no contract privity between such individual and
supplier.

The Rules do seem to raise some questions which are bound to attract
more debate and seems in all probability a case for future litigation.

Mohit Abraham is a Member of Governing Board of the Nuclear Law
Association (NLA) and Chairs the Working Group on Nuclear Liability at
NLA.

II.
http://www.dnaindia.com/analysis/comment_why-the-nuclear-liability-rules-need-to-be-modified_1621411-all

Why the Nuclear Liability Rules need to be modified
Dr A Gopalakrishnan | Monday, December 5, 2011

Background
Both the Civil Liability for Nuclear Damage Act, 2010, and the
associated Civil Liability for Nuclear Damage Rules, 2011, have been
gazetted. The provisions of the Act came into force on November 11,
2011, but the rules can still be contested in Parliament within 30
days of their introduction.

During the final discussions on the India-US Nuclear Deal, the prime
minister wanted to assure the governments of the US, France and
Russia, as well as their nuclear corporate lobbies, that India shall
provide a liability-free regime for them to do nuclear commerce with
India. It was for this reason that the PM agreed in 2008 itself to
their demand that India shall take steps to adhere to the Convention
on Supplementary Compensation, which will make it mandatory for India
to enact a national nuclear liability law that will channel liability
for damages from a nuclear accident completely to the operator,
namely, the Nuclear Power Corporation of India Limited. This is the
backdrop in which the government prepared and introduced the Civil
Liability for Nuclear Damage Bill in Parliament in mid-2010.

Nuclear Liability Act
Accordingly, the Bill that the government introduced in Parliament
capped the liability on the Indian operator at a very low level, and
did not include any provision for channeling even part of the damage
liability to the suppliers. After some of us gave extensive
testimonies to the parliamentary committee examining the Bill and
after the opposition had heated debates on the floor of the House, a
final Act was passed with a slightly higher operator liability of
Rs1,500 crore for nuclear power reactors and, more importantly,
included clauses 17(b) and 46 that could enable the seeking of damage
compensation from the suppliers.
Article continues below the advertisement...

To claim recourse under 17(b), the operator has to prove that the
incident occurred because the supplied equipment or material had
‘patent or latent defects or the services provided were sub-standard.’
But, under Section 46, a victim of a nuclear accident could bring a
liability claim against the operator in courts under Tort Law and
include the supplier also as co-defendant. In this case, the
plaintiffs have to merely prove that the product or service caused the
harm, but do not have to prove exactly how the product or service was
deficient or that the supplier was negligent. The damages to be
awarded in such cases are not specifically capped under law, and these
will be decided by the court, based on circumstances.

Attempt to Dilute the Act
Soon after the Nuclear Liability Act was passed, the western
governments and the nuclear business lobbies made it clear that India
has failed to deliver the kind of liability regime the PM promised. To
partially assuage these feelings, the PM hastened to have India sign
the CSC as promised to the US government in September 2008 and, in his
recent meeting with President Barack Obama in Bali, confirmed that
India will soon ratify the CSC as well. But, even after ratification
of the CSC, India’s eventual entry into the CSC will be held up
because our National Liability Law does not conform to the mandatory
stipulations in the CSC Annex, since it contains Clauses 17(b) and 46.

Having failed to enact a Liability Act that could please the foreign
governments and their corporate lobbies, the PM and the government are
under great pressure to amend the Act. However, the government knows
it is it impossible to approach the Parliament for an amendment of the
Liability Act in the prevailing atmosphere of scams and mismanagement
by the government and its low credibility. Under the circumstances, as
a last resort, the government is attempting to dilute Parliament’s
legislative intent in enacting this Act, by cleverly manipulating the
rules under this Act. At first glance, the rules appear to be
consistent with the Act, in that the Clauses 17(b) and 46, which were
offensive to foreign governments and suppliers, have not been directly
tampered with in any way. But the government’s sleight of hand can be
seen if one carefully analyses the contents of Chapter V of the rules,
which explains the operator’s Right of Recourse under Clause 17(a) of
the Act.

Amount of Supplier’s Liability
First, Rule 24(1) states: ‘A contract referred to in clause (a) of
Section 17 of the Act shall include a provision for right of recourse
for not less than the extent of the operator’s liability under Section
6(2) of the Act, or the value of the contract itself, whichever is
less.’ Further, it is clarified, under Explanation-2, that an
operator’s claim under this rule shall in no case exceed the actual
amount of compensation paid by him up to the date of filing such
claim.

The above rule bounds the amount of compensation which the operator
can seek from the supplier through right of recourse under Clause
17(a) of the Act. Since the maximum liability of the operator is
Rs1,500 crore as per the Act, Rule 24(1) states that the right of
recourse from the supplier in no case can be more than that amount,
whatever be the contract value. But, if the contract value is lower
than that, the right of recourse from the supplier will be capped at
the contract value. In any case, certainly Rule 24(1) appears to
preclude the operator from seeking any ‘consequential damages’ from
the supplier, under Section 17(a) of the Act, to compensate for the
larger damage the supplies could have caused to the public and the
environment.

In comparing norms across various high risk industries, I find that
the amount of compensation due under the right for recourse, where a
contract exists, cannot exceed the operator’s own liability or the
value of the contract, whichever is less. To this extent, one cannot
fault Rule 24(1) as stated in Chapter V of the Rules. This,
unfortunately, is the consequence of Parliament limiting the
operator’s liability for nuclear reactor accidents at Rs1,500 crore in
Section 6(2) of the Liability Act, against the repeated pleas at that
time to substantially increase that cap. In my view, the only option
now left is to argue for higher compensation, including consequential
damages, under Section 46, relying on Tort Laws.

Validity Period for Supplier’s Liability
Next, let us look at the duration for which the supplier’s liability
will be valid under Clause 17(a). If we bring in the definition given
in Rule 24(2)(a) for ‘product liability period’ into the body of Rule
24(2), it will read as follows: ‘The provision for right of recourse
referred to in sub-rule 24(1) shall be for the duration of initial
licence issued under the Atomic Energy (Radiation Protection) Rules,
2004, or ‘the period for which the supplier has undertaken liability
for patent or latent defects or sub-standard service under a
contract’, whichever is longer.

The duration of initial licence is a stipulation of the Atomic Energy
Regulatory Board, and it is purely a time limit to periodically stop
and review the overall operational & safety management of a facility
by the operator. It has been set at five years for a long time now,
and it has no direct connection with the supplier or his supplies. The
licensing period is illogically brought into Rule 24(2), just to
enable an ‘either-or’ provision, with one end-point as low as five
years.

The legal intent of the Act was to provide three separate and
stand-alone sub-clauses, viz 17(a), 17(b), and 17(c). In formulating
the Liability Rules, government was careful not to interfere with the
controversial Clause 17(b) of the Act, fearing the wrath of
Parliament. As per the Act, 17(b) reads, ‘The operator… shall have the
right of recourse where the nuclear incident has resulted as a
consequence of an act of the supplier or his employee, which includes
supply of equipment or material with patent or latent defects or
sub-standard services.’ But, if we now compare this with Clause 17(a),
as elaborated through Rules 24(2) and 24(2)(a), it can be seen that
both Sections 17(a) and 17(b) now deal with the identical shortcoming
of ‘supply of equipment or material with patent or latent defects or
sub-standard services.’ Except that, under 17(a) and the associated
contract between the operator and supplier, the quantum and time
validity of the supplier’s liability to the operator under right of
recourse is well-defined and bounded, whereas for the same default of
the supplier, Section 17(b) of the Act allows recourse without
specifying limits on time period or amount!
If an accident occurs within the applicable time limit as per the
contract mentioned in Section 17(a), the operator can argue for
recourse under Section 17(a), for the quantum of compensation as per
that contract.

But, if an accident occurs, as a result of the supply, beyond the
period of validity mutually agreed in the contract, Section 17(a) will
not help in seeking right of recourse, because it will be time-barred
through the limitation in the contract. Unfortunately, then Section
17(b) can also not be resorted to, because the supplier will argue
that, for the very same deficiency or default, he has a contract with
the operator whose time validity has already expired. In effect, one
finds that through a clever Rule manipulation under 17(a), the
government has succeeded in linking Clauses 17(a) and 17(b) of the
Act, in contravention of the legal intent of the Parliament that they
should be independent of each other, and applicable separately. The
serious consequence of this linkage is that the provisions for
recourse from the supplier given in the contract under Section 17(a)
and its rules will prevail at all times, thus nullifying the
provisions of Clause 17(b).

Correct the Liability Rules
It is evident from the above analysis that the modification needed in
the Rules presently before the Parliament is to delink the artificial
coupling that the government has introduced between Clauses 17(a) and
17(b) of the Act through these Rules. This can be achieved by
retaining Clause 17(b) as it is, and changing Rules 24(2) and 24(2)(a)
to remove any mention of ‘liability for patent or latent defects or
sub-standard services’ from these Rules, since such defects and
sub-standard services are already independently covered under Clause
17(b).

In normal product or service liability contracts, the supplier
guarantees a safe and assured life for his product or service
delivered to the operator, a period during which the supplier confirms
it will function as per the mutually agreed performance
specifications. It shall be the onus of the operator to ensure that
the guarantee period he is agreeing with the supplier is adequately
high for such supplies and it should be consistent with the product
lifetime and/or failure probability used in the Probabilistic Risk
Analysis for the system which he has submitted to the safety
regulatory agency and got approved. Clause 17(a) then needs to rely on
this product guarantee period as the time validity for the operator’s
right of recourse, instead of surreptitiously bringing in the
licensing period which has no relevance in this context.

To translate the above argumentsinto a Rule change, Parliament may
kindly consider replacing the current Rule 24(2) and its Explanation-I
(a) in Chapter V of the Rules with the following revised wording of
Rule 24(2), followed by a revised Explanation-I consisting of parts
(a) through (d), as given below. The current version of Rule 24(2)(b)
and Explanation 2 may please be retained.

24(2): The provision for right of recourse referred to in sub-rule (1)
shall be for the duration of ‘the product guarantee period.’ This rule
is to be read and implemented in conjunction with parts (a) through
(d) of Explanation -I, given below.
Explanation- I :
a) For the purpose of this rule, the expression ‘product guarantee
period’ means the safe and assured life for the product or service
delivered to the operator during which period the supplier confirms it
will function as per the mutually agreed performance specifications,
provided the operator diligently follows all the stipulations of the
supplier regarding erection, commissioning, and operation &
maintenance, including the regular upkeep, inspection, and repairs
during the guarantee period as mutually agreed and detailed in the
contract at the outset.
b) In case of a confirmed failure of the product or the service
provided, within such a product guarantee period, the onus on the
operator will be merely to establish that he has diligently followed
all the stipulations spelt out by the supplier as part of the
contract.
c) Such guarantee period shall be adequately high in the context of
the prevailing worldwide nuclear industry norms for such products and
services, and consistent with the life expectancy and failure rate for
that product or service which the operator has used in the
Probabilistic Risk Analysis for the system and approved by the nuclear
safety regulatory agency.
d) If the failure occurs during the product guarantee period due to no
fault of the operator and if the operator has evidence to establish
that he has faithfully followed all stipulations as per contract, the
supplier shall be strictly liable to pay the mutually agreed
compensation as per Clause 17(a) of the Act, read with Rule 24(1). In
such a case, there shall be no onus on the operator to prove what
specific deficiency or negligence on the part of the supplier has
caused the failure or damage of the supplied product or service.

The author is a former chairman of the Atomic Energy Regulatory Board
of the Indian government

-- 
Peace Is Doable

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To post to this group, send an email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/greenyouth?hl=en-GB.

Reply via email to