[The concluding line of the news report reproduced below says it all:
"The announcement [as regards "making headway"] however is silent with
regards to the time line of this much-delayed project."]

http://timesofindia.indiatimes.com/india/Jaitapur-nuclear-project-makes-headway/articleshow/46902037.cms

Jaitapur nuclear project makes headway
TNN | Apr 13, 2015, 06.21 AM IST

MUMBAI: After PM Narendra Modi's recent visit to France, the
controversial and trouble-ridden Jaitapur Nuclear Power Project in
Maharashtra's Ratnagiri district moved a step forward.

The Nuclear Power Corporation and a French firm, Areva, signed what is
known as a pre-engineering agreement conforming to the "Make In India"
campaign, according to an announcement by the department of atomic
energy (DAE) on Sunday.

The Rs 1000 billion project envisages the setting up of initially two
Evolutional Pressurised Reactors each of 1650 mwe in collaboration
with France. On June 18, 2014, the Shiv Sena launched an agitation
against the plan. But Modi has assured the French government that
there was "no rethink about the project".

READ ALSO: India, France move closer to nuclear deal

Spread over an area of nearly 968 hectares, the scheme eventually
envisages the setting up of six reactors totalling 9900 mwes.

The nuclear project, which has attracted strong opposition from
various quarters on environmental and safety grounds, kicked off on
December 6, 2010, with India and France signing an agreement for the
construction of two reactors and supply of nuclear fuel for 25 years.
In the last five years it has literally remained on paper.



***The new agreement firmed up on April 10, 2015, chiefly relates to
the assessment of licenseability, adhering to Indian laws and codes
and general acceptability and understanding of the technology
itself.*** [Emphasis added.]

According to DAE, ***after a detailed safety assessment, the NPC will
take up the licensing process with the Atomic Energy Regulatory Board
(AERB)*** [emphasis added].

A significant aspect of the agreement is that it will maximize the
scope of localization of different components conforming to the "Make
In India" campaign.

READ ALSO: Jaitapur N-plant -- villagers reject govt's revised
compensation package

According to the DAE, EPR is an advanced light-water reactor (LWR)
technology. "Understanding the nuances of this technology will also be
to our advantage as NPC strives to augment its capability in the LWR
technology," it added.

***The announcement however is silent with regards to the time line of
this much-delayed project*** [emphasis added].

-- 
Peace Is Doable

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send an email to [email protected].
Visit this group at http://groups.google.com/group/greenyouth.
For more options, visit https://groups.google.com/d/optout.

Reply via email to