[The power generation was stopped last year on June 24 for maintenance purpose for two months. Then the regeneration of power got inordinately delayed.]
http://www.aninews.in/newsdetail2/story248177/power-generation-in-kudankulam-039-s-first-plant-to-begin-again-after-six-months.html Power generation in Kudankulam's first plant to begin again after six months Jan 14, 10:17 pm Koodankulam (Tamil Nadu), Jan. 14 (ANI): Kudankulam Nuclear Power Plant site director R.S. Sundar has said the power generation in the first unit, which was stopped for maintenance for six months, will begin again next week. ***The power generation was stopped last year on June 24 for maintenance purpose for two months. Then the regeneration of power got inordinately delayed.*** [Emphasis added.] Tamil Nadu Chief Minister Jayalaithaa had written a letter to Prime Minister Narendra Modi, urging him for the revival of power generation in the nuclear unit. Sundar said at present testing of valves is being done, thereafter hydro test of the device will be conducted. Atomic Energy Regulatory Board officials stationed at the plant will give the go ahead to the power generation once the parameters are complete. He said till now 687.5 million units of electricity had been generated with Rs 1,565 crore. The first unit of Kudankulam nuclear power plant achieved criticality in July 2014. (ANI) Kudankulam Nuclear Power Plant, Chief Minister Jayalaithaa, site director R.S. Sundar, -- Peace Is Doable -- You received this message because you are subscribed to the Google Groups "Green Youth Movement" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send an email to [email protected]. Visit this group at https://groups.google.com/group/greenyouth. For more options, visit https://groups.google.com/d/optout.
