The adoption call for draft-snijders-idr-shutdown has been completed (11/16 to 11/30) and the WG consensus is that this draft should be adopted. The authors should submit this draft as draft-ietf-idr-shutdown-00.txt.
Due to the fact the operators responding to the adoption call this draft fulfills a current operational need, this draft will move rapidly from adoption to WG LC. Just a reminder the three things needed for entering WG LC are: stable specification, 2 implementations, and the routing directorates QA reviews. For example, if 2 implementations were completed by 12/15, the chairs would start a WG LC beginning on 12/15. The authors should send the IDR chairs a note if they feel the specification is ready for the routing directorate QA review. The routing directorate QA review can be done when technical content is stable (rather than when the text is finalized). Sue Hares
_______________________________________________ GROW mailing list [email protected] https://www.ietf.org/mailman/listinfo/grow
