Sure, I'm attaching it to this email.

The part we're not entirely sure about is this area in the SEG:

else if (strstr(fields[3], "finished") == fields[3])

The default SEG has "deleted" there, but we found that in on our system, the
"deleted" line is not always printed in the reporting file.  However, there
are multiple "finished" lines, so this could potentially cause problems, not
to mention that using "finished" I still got jobs returned prematurely,
which is why there's a sleep() call in there.  So we're still tweaking
things, but this basic solution should work for most people.

Adam




On Fri, Oct 1, 2010 at 12:29 PM, Prakashan Korambath <[email protected]>wrote:

> Dear Adam,
>
> Glad to hear that you resolved the problem.  Please post it in the mailing
> list.    Thanks.
>
> Prakashan
>
>
>
> On 10/01/2010 09:06 AM, Adam Bazinet wrote:
>
>> Dear Prakashan,
>>
>> Thanks for your reply.  Just confirming that we were running into the same
>> problem was very helpful.
>>
>> Our solution involves modifying both sge.pm<http://sge.pm>  and sge's SEG
>> to keep track, using auxiliary files, of how many sub-jobs in a batch have
>> completed, and to only send the final "Done" notification when all sub-jobs
>> have completed.
>>
>> If anyone is interested in having this, we could send you our code, which
>> is basically working.  It consists of a modified sge.pm<http://sge.pm>,
>> sge SEG, and a separate shell script.
>>
>> thanks,
>> Adam
>>
>>
>>
>> On Tue, Sep 7, 2010 at 11:33 AM, Prakashan Korambath<[email protected]
>> <mailto:[email protected]>>  wrote:
>>
>> Hi Adam,
>>
>> It has been almost two years since we looked at this problem.  I have to
>> refresh my memories, but the problem is that it may be difficult for
>> reporting file to tell GRAM that last array job is done.  Say you submitted
>> 500 array jobs, and it is always possible that some of the array jobs like
>> 467, 468 (example) may be still running when job 500 is finished because
>> some nodes may be overloaded etc.  So we can't look at the last array job id
>> even if that is possible.
>>
>> I think the best solution would be for GRAM to report back the JOBID to us
>> and we independently probe whether all jobs for that jobid is completed
>> using a Fork job submission periodically.  This will work for workflows.
>>
>> Prakashan
>>
>>
>> Adam Bazinet wrote:
>> Just to follow up on this, here is some additional evidence:
>>
>> Globus GRAM debugging:
>>
>> 2010-09-06T19:50:00.980-04:00 DEBUG seg.SchedulerEventGenerator
>> [SEG-sge-Thread,run:171] seg input line: 001;1283816997;1708;8;0
>> 2010-09-06T19:50:00.980-04:00 DEBUG seg.SchedulerEventGeneratorMonitor
>> [SEG-sge-Thread,addEvent:523]  JSM receiving scheduler event 1708 [Mon Sep
>> 06 19:49:57 EDT 2010] Done
>> 2010-09-06T19:50:00.980-04:00 DEBUG seg.SchedulerEventGeneratorMonitor
>> [SEG-sge-Thread,addEvent:534] Dispatching event 1708 to job
>> 26b12c40-ba11-11df-a8c7-93aa2282a0f7
>> 2010-09-06T19:50:00.980-04:00 DEBUG utils.GramExecutorService
>> [SEG-sge-Thread,execute:52] # tasks: 0
>> 2010-09-06T19:50:00.980-04:00 DEBUG seg.SchedulerEventGenerator
>> [SEG-sge-Thread,run:171] seg input line: 001;1283816997;1708;8;0
>> 2010-09-06T19:50:00.980-04:00 DEBUG exec.ManagedExecutableJobHome
>> [pool-2-thread-1,jobStateChanged:399] Receiving jobStateChange event for
>> resource key {
>> http://www.globus.org/namespaces/2008/03/gram/job}ResourceID=26b12c40-ba11-11df-a8c7-93aa2282a0f7<http://www.globus.org/namespaces/2008/03/gram/job%7DResourceID=26b12c40-ba11-11df-a8c7-93aa2282a0f7>
>> <
>> http://www.globus.org/namespaces/2008/03/gram/job%7DResourceID=26b12c40-ba11-11df-a8c7-93aa2282a0f7>
>>  with:
>>
>> timestamp Mon Sep 06 19:49:57 EDT 2010
>> (new) state Done
>> exitCode 0
>>
>> The "seg input line", above, occurs in the SGE reporting file here:
>>
>>
>> 1283816997:job_log:1283816997:deleted:1708:1:NONE:T:scheduler:topaz.si.edu:0:1024:1283816885:sge_job_script.38191:globus:staff::defaultdepartment:sge:job
>> deleted by schedd
>>
>> 1283816997:job_log:1283816997:deleted:1708:7:NONE:T:scheduler:topaz.si.edu:0:1024:1283816885:sge_job_script.38191:globus:staff::defaultdepartment:sge:job
>> deleted by schedd
>>
>> (the only two lines in the file with this timestamp; these happen to be
>> the first 2/8 jobs in the batch to finish)
>>
>> It's pretty clear that as soon as any sub-job finishes, Globus thinks the
>> whole batch is done and goes ahead with subsequent processing stages (e.g.,
>> MergeStdout, StageOut).  I'm guessing the place to fix this is in the SEG
>> code; I'm willing to bet someone already has patched this.  If so, would you
>> be willing to share?
>>
>> thanks,
>> Adam
>>
>>
>>
>> On Mon, Sep 6, 2010 at 5:17 PM, Adam Bazinet<[email protected]
>> <mailto:[email protected]><mailto:[email protected]<mailto:
>> [email protected]>>>  wrote:
>>
>> Hi everyone,
>>
>> Was this issue ever resolved?  It is affecting our Globus installation
>> (4.2.1) and SGE cluster as well.  Specifically, the job seems to enter the
>> StageOut phase prematurely (say, when 6/8 jobs in a task array are
>> completed).  Any assistance is greatly appreciated.
>>
>> thanks,
>> Adam
>>
>>
>>
>> On Tue, May 27, 2008 at 12:51 PM, Korambath, Prakashan<[email protected]
>> <mailto:[email protected]><mailto:[email protected]<mailto:[email protected]>>>
>>  wrote:
>>
>>
>> Hi Martin,
>>
>>  I am using gt4.0.6 on the client node.  I didn't try with Fork.  Let me
>> see how Fork behaves.  Thanks.
>>
>> Prakashan
>>
>>
>>
>>
>> -----Original Message-----
>> From: Martin Feller [mailto:[email protected]<mailto:[email protected]
>> >]
>> Sent: Tue 5/27/2008 9:48 AM
>> To: Korambath, Prakashan
>> Cc: gt-user; Jin, Kejian; Korambath, Prakashan
>> Subject: Re: [gt-user] Globus GRAM reporting status for each task in a SGE
>> job-job array submission
>>
>> Prakashan:
>>
>> GRAM should send a Done notification if the last job is done, and not when
>> the first job is done. I tried it here and it works as expected for me.
>> What GT version are you using?
>> This is probably not at all SGE related, but does it behave in the same
>> way
>> when you submit to, say, Fork instead of SGE?
>>
>> Martin
>>
>>
>> ----- Original Message -----
>> From: "Prakashan Korambath"<[email protected]<mailto:[email protected]
>> ><mailto:[email protected]<mailto:[email protected]>>>
>> To: "gt-user"<[email protected]<mailto:[email protected]><mailto:
>> [email protected]<mailto:[email protected]>>>, "Kejian Jin"<
>> [email protected]<mailto:[email protected]><mailto:[email protected]
>> <mailto:[email protected]>>>, "Prakashan Korambath"<[email protected]
>> <mailto:[email protected]><mailto:[email protected]<mailto:[email protected]
>> >>>
>> Sent: Monday, May 26, 2008 4:10:46 PM GMT -06:00 US/Canada Central
>> Subject: [gt-user] Globus GRAM reporting status for each task in a SGE
>> job-job array submission
>>
>>
>>
>>
>> Hi,
>>
>> We noticed that Globus GRAM status reporting service (eg: globusrun-ws
>> -status -j job_epr) reports status as 'Done' immediately when first few
>> tasks in a job-array (multi jobs) are completed. Is there a way to make it
>> wait until the last task in the job array is completed? It is ok if all
>> tasks are completed within few seconds apart, but in most cases they are not
>> and globus reports the entire job is finished based on perhaps the reading
>> from $SGE_ROOT/common/reporting file when there are still tasks waiting to
>> be run. If there is an option to query the status of the last task in a job
>> array it would be nice. Thanks.
>>
>>
>> Prakashan Korambath
>>
>>
>>
>>
>>
>>
>>