Please respond to [email protected]

*ORACLE AGILE PLM FUNCTIONAL:*

*Duration:  9 Months*

*Location:   North California *



 AGILE PLM

PRODUCT COLLABORATION

DESIGN TO RELEASE PROCESS INTEGRATION PACK (PIP)



PRODUCT COLLABORATION

Review attributes after technical upgrade to Agile 9.3.3

Add attribute control where needed to better control attribute changes

Review status control with Agile and EBS to ensure EOL and other key
statuses are managed correctly

Implement a single consolidated BOM in Agile that replaces the marketing
BOM and addresses the assembly BOM requirements

Ability to maintain pricing and other product attributes by territory



DESIGN TO RELEASE PROCESS INTEGRATION PACK (PIP)

Implement PIP with R12

Review what attributes really need to be passed to EBS for items and BOMs

Ability to pass cost and inventory balances back to Agile


Thanks & Regards

*BALA*
*SIYATON GLOBAL SOLUTIONS, INC*
1590 S. Milwaukee Ave | STE # 317 | Libertyville, IL 60048
Work: 847-243-6001 | Fax: (703)-995-4431
[email protected] | www.siyaton.com

-- 
You received this message because you are subscribed to the Google Groups "GTA 
DBA" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/gtadba.
For more options, visit https://groups.google.com/d/optout.

Reply via email to