Berin Loritsch wrote:
How long does it take to have a GUMP run go?
on a desktop-class duron 1ghz / 256MB 266DDR / UDMA1000 7200rpm / red hat linux / 100mbit / sun jdk1.4.1 machine, it takes about 3 hours to rsync and copy over all the cvs modules, then it takes about 4 hours to perform all the builds.
I guess a corrolery to the question of how *long* the build takes is how much space do the builds take?
about 4GB on my machine atm.
Hmm. The 3 hours to rsync and copy all the CVS modules would be highly dependant on the internet connection bandwidth. The four hours for a build is seemingly unavoidable though.
Essentially you are saying that a completely fresh GUMP run will require roughly 7 hours from start to finish. In order to get the four hour interval I would like we would need two machines running the builds constantly. Each machine would do three builds a day.
The 4 GB is problamatic for me. I only have so much room on my laptop drive, esp. since I installed .NET Visual Studio (which consumes about that much space itself).
Does GUMP have the ability to determine dependencies so that if all I wanted to do was run GUMP builds on one project with its dependencies, it would be able to generate the proper profile for me?
I only have about 2GB to offer for GUMP runs.
--------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
