2009/3/23 Chris Meller <[email protected]>:
> FYI, there are 42 tickets with a 0.6 milestone still open on Trac:
> http://trac.habariproject.org/habari/report/3

Another release comes around and we still, unfortunately, don't have a
proper strategy for dealing with milestones. At this stage, I think we
need to identify how many of those tickets are blockers for 0.6. My
guess is very, very few.

Some of them are catchall bugs that probably should be closed anyway,
like #11 and #26, and more specific bugs opened if necessary.

And some are done, I think, such as #372 and #886.

IMHO, these should obviously be moved to a later release:
* Anything to do with autop (#767, #862) because the autop branch will
fix them later
* Admin tag management (#602, there are already related tickets with
later milestones)
* subsites (#61, which was slated for 0.8 anyway)
* translation (#893, #864, #915, #874, #744)
* Quick upload for silos (#456)

This is just from a quick look. I'm sure there are others that don't
_need_ to go into 0.6.

-- 
Michael C. Harris, School of CS&IT, RMIT University
http://twofishcreative.com/michael/blog
IRC: michaeltwofish #habari

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at http://groups.google.com/group/habari-dev
-~----------~----~----~----~------~----~------~--~---

Reply via email to