I'd be onboard with that plan too. Consistent 7.10's across the board.

Last announcement for 7.10.2 was in June 2 for a few weeks; it's been
a few weeks, how long does that give us to prepare this (assuming we
want to do it as soon as feasible)?

On 25 June 2015 at 19:28, Gershom B <[email protected]> wrote:
> On first glance, I think I'm basically +1 on this proposal -- with the
> caveat that I'd like the cutover to happen after the 7.10.2 release and
> platform release that goes with it, so we can sort of move everything in
> sync. (I.e. there should be a uniform point in time in which we start
> pointing all the downloads on the site from 7.8 series to 7.10 series).
>
> --Gershom
>
> On Thu, Jun 25, 2015 at 1:23 PM, Christopher Done <[email protected]>
> wrote:
>>
>> I also volunteer to work with Erik to make this happen if enough
>> agreement is expressed.
>> _______________________________________________
>> haskell-infrastructure mailing list
>> [email protected]
>> http://community.galois.com/mailman/listinfo/haskell-infrastructure
>
>
_______________________________________________
haskell-infrastructure mailing list
[email protected]
http://community.galois.com/mailman/listinfo/haskell-infrastructure

Reply via email to