[
https://issues.apache.org/jira/browse/HDFS-8123?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Rakesh R updated HDFS-8123:
---------------------------
Summary: Erasure Coding: Better to move EC related proto messages to a
separate erasurecoding proto file (was: Erasure Coding: Better to move EC
related proto messages to a separate 'erasurecode.proto' file)
> Erasure Coding: Better to move EC related proto messages to a separate
> erasurecoding proto file
> -----------------------------------------------------------------------------------------------
>
> Key: HDFS-8123
> URL: https://issues.apache.org/jira/browse/HDFS-8123
> Project: Hadoop HDFS
> Issue Type: Sub-task
> Reporter: Rakesh R
> Assignee: Rakesh R
> Attachments: HDFS-8123-001.patch, HDFS-8123-002.patch,
> HDFS-8123-003.patch, HDFS-8123-004.patch
>
>
> While reviewing the code I've noticed EC related proto messages are getting
> added into {{hdfs.proto}}. IMHO, for better maintainability of the erasure
> code feature, its good to move this to a separate {{erasurecode.proto}} file.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)