[ 
https://issues.apache.org/jira/browse/HDFS-8398?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Yi Liu updated HDFS-8398:
-------------------------
    Summary: Erasure Coding: Correctly calculate last striped block length in 
DFSStripedInputStream if it's under construction.  (was: Erasure Coding: 
Correctly calculate last striped block length if it's under construction.)

> Erasure Coding: Correctly calculate last striped block length in 
> DFSStripedInputStream if it's under construction.
> ------------------------------------------------------------------------------------------------------------------
>
>                 Key: HDFS-8398
>                 URL: https://issues.apache.org/jira/browse/HDFS-8398
>             Project: Hadoop HDFS
>          Issue Type: Sub-task
>            Reporter: Yi Liu
>            Assignee: Yi Liu
>
> Currently, for continuous block, if it's under construction, we need to read 
> the block replica length from one of datanode and use it as last block length.
> For striped block, we need to read the length of all internal data blocks of 
> the striped group, then add them correctly.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to