[ 
https://issues.apache.org/jira/browse/HDDS-2518?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Xiaoyu Yao updated HDDS-2518:
-----------------------------
    Status: Patch Available  (was: Open)

> Ensure RATIS leader info is properly updated with pipeline report. 
> -------------------------------------------------------------------
>
>                 Key: HDDS-2518
>                 URL: https://issues.apache.org/jira/browse/HDDS-2518
>             Project: Hadoop Distributed Data Store
>          Issue Type: Bug
>            Reporter: Xiaoyu Yao
>            Assignee: Xiaoyu Yao
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> HDDS-2034 added async pipeline creation and report handling to SCM. The 
> leader information is not properly populated as manifested in the test 
> failures from TestSCMPipelineManager#testPipelineReport. This ticket is 
> opened to fix it. cc: [~sammichen]



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: hdfs-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: hdfs-issues-h...@hadoop.apache.org

Reply via email to