[
https://issues.apache.org/jira/browse/HDFS-16663?focusedWorklogId=791642&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-791642
]
ASF GitHub Bot logged work on HDFS-16663:
-----------------------------------------
Author: ASF GitHub Bot
Created on: 16/Jul/22 09:24
Start Date: 16/Jul/22 09:24
Worklog Time Spent: 10m
Work Description: lfxy opened a new pull request, #4567:
URL: https://github.com/apache/hadoop/pull/4567
In [HDFS-16613](https://issues.apache.org/jira/browse/HDFS-16613), increase
the value of dfs.namenode.replication.max-streams-hard-limit would maximize the
IO performance of the decommissioning DN, witch has a lot of EC blocks. Besides
this, we also need to decrease the value of
dfs.namenode.reconstruction.pending.timeout-sec, default is 5 minutes, to
shorten the interval time for checking pendingReconstructions. Or the
decommissioning node would be idle to wait for copy tasks in much time of this
5 minutes.
In decommission progress, we may need to reconfigure these 2 parameters
several times. In
[HDFS-14560](https://issues.apache.org/jira/browse/HDFS-14560), the
dfs.namenode.replication.max-streams-hard-limit can already be reconfigured
dynamically without namenode restart. And the
dfs.namenode.reconstruction.pending.timeout-sec parameter also need to be
reconfigured dynamically.
Issue Time Tracking
-------------------
Worklog Id: (was: 791642)
Remaining Estimate: 0h
Time Spent: 10m
> Allow block reconstruction pending timeout refreshable to increase
> decommission performance
> -------------------------------------------------------------------------------------------
>
> Key: HDFS-16663
> URL: https://issues.apache.org/jira/browse/HDFS-16663
> Project: Hadoop HDFS
> Issue Type: Improvement
> Components: ec, namenode
> Affects Versions: 3.4.0
> Reporter: caozhiqiang
> Assignee: caozhiqiang
> Priority: Major
> Time Spent: 10m
> Remaining Estimate: 0h
>
> In [HDFS-16613|https://issues.apache.org/jira/browse/HDFS-16613], increase
> the value of dfs.namenode.replication.max-streams-hard-limit would maximize
> the IO performance of the decommissioning DN, witch has a lot of EC blocks.
> Besides this, we also need to decrease the value of
> dfs.namenode.reconstruction.pending.timeout-sec, default is 5 minutes, to
> shorten the interval time for checking pendingReconstructions. Or the
> decommissioning node would be idle to wait for copy tasks in much time of
> this 5 minutes.
> In decommission progress, we may need to reconfigure these 2 parameters
> several times. In
> [HDFS-14560|https://issues.apache.org/jira/browse/HDFS-14560], the
> dfs.namenode.replication.max-streams-hard-limit can already be reconfigured
> dynamically without namenode restart. And the
> dfs.namenode.reconstruction.pending.timeout-sec parameter also need to be
> reconfigured dynamically.
>
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]