[ 
https://issues.apache.org/jira/browse/HDFS-16663?focusedWorklogId=791642&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-791642
 ]

ASF GitHub Bot logged work on HDFS-16663:
-----------------------------------------

                Author: ASF GitHub Bot
            Created on: 16/Jul/22 09:24
            Start Date: 16/Jul/22 09:24
    Worklog Time Spent: 10m 
      Work Description: lfxy opened a new pull request, #4567:
URL: https://github.com/apache/hadoop/pull/4567

   In [HDFS-16613](https://issues.apache.org/jira/browse/HDFS-16613), increase 
the value of dfs.namenode.replication.max-streams-hard-limit would maximize the 
IO performance of the decommissioning DN, witch has a lot of EC blocks. Besides 
this, we also need to decrease the value of 
dfs.namenode.reconstruction.pending.timeout-sec, default is 5 minutes, to 
shorten the interval time for checking pendingReconstructions. Or the 
decommissioning node would be idle to wait for copy tasks in much time of this 
5 minutes.
   
   In decommission progress, we may need to reconfigure these 2 parameters 
several times. In 
[HDFS-14560](https://issues.apache.org/jira/browse/HDFS-14560), the 
dfs.namenode.replication.max-streams-hard-limit can already be reconfigured 
dynamically without namenode restart. And the 
dfs.namenode.reconstruction.pending.timeout-sec parameter also need to be 
reconfigured dynamically.
   
   




Issue Time Tracking
-------------------

            Worklog Id:     (was: 791642)
    Remaining Estimate: 0h
            Time Spent: 10m

> Allow block reconstruction pending timeout refreshable to increase 
> decommission performance
> -------------------------------------------------------------------------------------------
>
>                 Key: HDFS-16663
>                 URL: https://issues.apache.org/jira/browse/HDFS-16663
>             Project: Hadoop HDFS
>          Issue Type: Improvement
>          Components: ec, namenode
>    Affects Versions: 3.4.0
>            Reporter: caozhiqiang
>            Assignee: caozhiqiang
>            Priority: Major
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> In [HDFS-16613|https://issues.apache.org/jira/browse/HDFS-16613], increase 
> the value of dfs.namenode.replication.max-streams-hard-limit would maximize 
> the IO performance of the decommissioning DN, witch has a lot of EC blocks. 
> Besides this, we also need to decrease the value of 
> dfs.namenode.reconstruction.pending.timeout-sec, default is 5 minutes, to 
> shorten the interval time for checking pendingReconstructions. Or the 
> decommissioning node would be idle to wait for copy tasks in much time of 
> this 5 minutes.
> In decommission progress, we may need to reconfigure these 2 parameters 
> several times. In 
> [HDFS-14560|https://issues.apache.org/jira/browse/HDFS-14560], the 
> dfs.namenode.replication.max-streams-hard-limit can already be reconfigured 
> dynamically without namenode restart. And the 
> dfs.namenode.reconstruction.pending.timeout-sec parameter also need to be 
> reconfigured dynamically. 
>  



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to