[ 
https://issues.apache.org/jira/browse/HDFS-5889?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13900073#comment-13900073
 ] 

Vinayakumar B commented on HDFS-5889:
-------------------------------------

Yes, +1 from my side too.

bq.We also need to change FSImage format for adding upgrade info. Otherwise, 
the upgrade info will be lost if it uses a checkpoint to restart. Let's commit 
this first and do the work separately so that this will unblock HDFS-5920. Do 
you agree?
I too was thinking about the same problem and then saw this already mentioned. 
Its ok to commit now and handle this separately

> When rolling upgrade is in progress, standby NN should create checkpoint for 
> downgrade.
> ---------------------------------------------------------------------------------------
>
>                 Key: HDFS-5889
>                 URL: https://issues.apache.org/jira/browse/HDFS-5889
>             Project: Hadoop HDFS
>          Issue Type: Sub-task
>          Components: namenode
>            Reporter: Tsz Wo (Nicholas), SZE
>            Assignee: Tsz Wo (Nicholas), SZE
>         Attachments: h5889_20140211.patch, h5889_20140212b.patch, 
> h5889_20140212c.patch
>
>
> After rolling upgrade is started and checkpoint is disabled, the edit log may 
> grow to a huge size.  It is not a problem if rolling upgrade is finalized 
> normally since NN keeps the current state in memory and it writes a new 
> checkpoint during finalize.  However, it is a problem if admin decides to 
> downgrade.  It could take a long time to apply edit log.  Rollback does not 
> have such problem.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)

Reply via email to