[ 
https://issues.apache.org/jira/browse/HDFS-5924?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13910150#comment-13910150
 ] 

Vinayakumar B commented on HDFS-5924:
-------------------------------------

I think approach (3) is better, anyway fallback to normal pipeline recovery 
also will be done once timeout occurs.

By seeing the patch attached, waiting will happen if only local datanode is 
restarted for upgrade. Is that enough?
 no need to wait if other node in the pipeline is being upgraded.?

> Utilize OOB upgrade message processing for writes
> -------------------------------------------------
>
>                 Key: HDFS-5924
>                 URL: https://issues.apache.org/jira/browse/HDFS-5924
>             Project: Hadoop HDFS
>          Issue Type: Sub-task
>          Components: datanode, ha, hdfs-client, namenode
>            Reporter: Kihwal Lee
>            Assignee: Kihwal Lee
>         Attachments: HDFS-5924_RBW_RECOVERY.patch, 
> HDFS-5924_RBW_RECOVERY.patch
>
>
> After HDFS-5585 and HDFS-5583, clients and datanodes can coordinate 
> shutdown-restart in order to minimize failures or locality loss.
> In this jira, HDFS client is made aware of the restart OOB ack and perform 
> special write pipeline recovery. Datanode is also modified to load marked RBW 
> replicas as RBW instead of RWR as long as the restart did not take long. 
> For clients, it considers doing this kind of recovery only when there is only 
> one node left in the pipeline or the restarting node is a local datanode.  
> For both clients and datanodes, the timeout or expiration is configurable, 
> meaning this feature can be turned off by setting timeout variables to 0.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)

Reply via email to