So to get this straight, Thomas: you just taped it up to the top for the tape anchors and it worked perfectly fine without having it go all the way across? You also only used 6 tape anchors on your 8' tall stretch? I'm debating trying to pre-tape some of my tape anchors so I have to do minimal work on the playa, and I'm thinking of pre-taping 4 of my 6 tape anchors at home. I'm building the standard full size yurt with 4' tall walls, and my build plan is all 6 walls accordian, while the roof is in two accordians. When I get to the playa i'd connect the roof, run one tape anchor continuously to the other side all the way across OVER the uncontinuous tape for the other 4 corners with tape anchors.. if that makes sense. Does this seem viable?
On Aug 10, 2:00 pm, Thomas Tempelmann <[email protected]> wrote: > > What about passing tape over flat edges at the top? (e.g. using one in > > the center of the long roof panel, instead of one on each side). Will > > the compression cause problems? If not, that would let me get away > > with 4 anchors. Is 4 enough to hold down a stretch? > > I did run the 6" tape over the corners, and it worked well. I had a 8" > tall stretch yurt made of hexacomb board. For stability, I believe > that pulling down the corners is where it's most efficient. > Of course, that way the tape can't run all the way from one side to > the other, but that did not matter. The special 6" tape from > goodbuyguys was holding perfectly even if only run from the top the > the edge down. > > Thomas -- You received this message because you are subscribed to the Google Groups "hexayurt" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/hexayurt?hl=en.
