So to get this straight, Thomas: you just taped it up to the top for
the tape anchors and it worked perfectly fine without having it go all
the way across?
  You also only used 6 tape anchors on your 8' tall stretch?  I'm
debating trying to pre-tape some of my tape anchors so I have to do
minimal work on the playa, and I'm thinking of pre-taping 4 of my 6
tape anchors at home.  I'm building the standard full size yurt with
4' tall walls, and my build plan is all 6 walls accordian, while the
roof is in two accordians.  When I get to the playa i'd connect the
roof, run one tape anchor continuously to the other side all the way
across OVER the uncontinuous tape for the other 4 corners with tape
anchors.. if that makes sense.  Does this seem viable?


On Aug 10, 2:00 pm, Thomas Tempelmann <[email protected]> wrote:
> > What about passing tape over flat edges at the top? (e.g. using one in
> > the center of the long roof panel, instead of one on each side). Will
> > the compression cause problems? If not, that would let me get away
> > with 4 anchors. Is 4 enough to hold down a stretch?
>
> I did run the 6" tape over the corners, and it worked well. I had a 8"
> tall stretch yurt made of hexacomb board. For stability, I believe
> that pulling down the corners is where it's most efficient.
> Of course, that way the tape can't run all the way from one side to
> the other, but that did not matter. The special 6" tape from
> goodbuyguys was holding perfectly even if only run from the top the
> the edge down.
>
> Thomas

-- 
You received this message because you are subscribed to the Google Groups 
"hexayurt" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/hexayurt?hl=en.

Reply via email to