Dear IAGI Member,


Biro Kursus IAGI (Indonesian Association of Geologists) has arranged a
workshop in November 2013.  Workshop will be held at Yogyakarta, Indonesia,
Indonesia.



*“CBM Reservoir Engineering, Drilling and Completion : From Exploration to
Production, the Technical Challenges”*



* *

*November 13th-15th**, 2013*

*Yogyakarta**, Indonesia *



Instructor                               : Dr. Alan A. Bayrak

Duration                          : 3 Days Workshop

Workshop Level                   : Intermediate



*About The Workshop :*

This course is designed to assist individuals throughout the financial,
coal and petroleum industries understand Coal Seam Gas (CBM). This will
cover the entire CBM project spectrum, from exploration to production, and
is intended to provide an introduction to those who are new to the CBM
industry yet show relevant case histories for those currently working on
ongoing CBM projects. This will  identify the unique characteristics of the
Australasian CBM scene, with relevant comparison to the historical
development of the  industry  in North America, and more recent
developments  in CBM throughout the world.  A  feature of  the course will
be  the presentation of a global perspective of  the similarities and
differences  in CBM plays.



*You Will Learn :***



CBM Reservoir Properties


   - ·         Properties that control GIP
   - ·         Properties that control fluid flow

Basic Reservoir Engineering for CBM


   - •        Data requirements
   - •        Calculating GIP
   - •        Analyzing and forecasting production

Introduction to CBM drilling


   - •        Unique challenges
   - •        Background to CBM drilling  development
   - •        CBM drilling basics
   - •        CBM drilling & geology
   - •        CBM Production & Completion from a drilling perspective.

Exploration drilling fundamentals:


   - •        Planning and managing a program
   - •        Equipment and contractor
   - •        Selection
   - •        Well control, a risk based approach
   - •        Coring and sampling
   - •        Well testing: theory, designing, performing, and analyzing

•        Pilot programs


   - •        Programs type
   - •        Planning and managing a program
   - •        The implications of a failed pilot and what to do next.

Production and Completion Methods for CBM


   - Reservoir consideration in completing CBM wells
   - The alternative approaches, pros and cons.
   - Selection of equipment and project management
   - Troubleshooting
   - Case studies

Introduction to Directional Drilling: the Key Components


   - •        Planning the hole
   - •        Rig set-up
   - •        Rig monitoring systems
   - •        Downhole equipment
   - •        Steering and Surveying
   - •        Real time decision making

Managed Pressure Drilling (MPD)


   - •        Underbalanced drilling–implications
   - •        Overbalanced drilling–implications
   - •        The benefits of MPD
   - •        Reservoir management issues

Production from Directional Drilling


   - •        Gas production equipment configuration
   - •        Liners and hole integrity

•        Case studies


   - •        The good, the bad and the ugly
   - *
   *
   - *
   *
   - *Who Should Attend :*
   - ü  Petroleum engineers,  reservoir  engineers and geologists who wish
   to understand CBM and how  to explore  succesfully..
   - ü  Potential  investors  in CBM projects, and  financial analysts
   - ü  CBM managers who wish to understand technical aspect like
   exploration drilling, pilot program, production and completion method.
   - ü  Anyone wishing  to  improve  their basic understanding of CBM
   especially  in Drilling and Completion  test.



*Investment Fee:*



*IDR 27.700.000,00 / participant*


The course fee includes meals (2x coffee break and lunch), training kits,
training materials, group photograph, certificate.In order to allow
sufficient time for arranging travel and processing document, participants
are recommended to make an early enrollment.



*Cancellation, Substitution & Non Attendance Policy:*

Tuition fees are transferable but not refundable. Notification is required
to substitute another participant, no later 5 working days prior to the
program, should the nominated person be unable to attend. Late cancellation
sometimes causes event to be abandoned. Non attendance participant will be
full charged as all preparations will have been done.



Minimum Participants: 7 persons



*About Instructor :*

Dr. Alan Bayrak is multi-disciplinary Exploration Geologist with 20 years
of international exploration experience in oil-gas and coal areas in
various geographical territories, including Queensland, New South Wales,
Otway Basin, Irish Midlands, Thrace Basin, Western Black Sea and
Carpathians, Kalimantan and Sumatra. He extensively  worked  entire
upstream  cycle and extensive exposure to coalbed methane (CBM) and coal
explorations. He experienced in preparation/management and execution of CBM
exploration drilling programs and CBM prospects. Moreover, from 2005, he
provide technical consultancty services  to a number of companies  for Coal
Seam Gas Exploration, Shale Gas and CBM Portfolio Management,  for example
LNG Japan Corporation (Technical evaluation of the South Kalimantan CBM
prospects), Energi Mega Persada (Managed Sangatta-II  and  Tabulako  CBM
Exploration  and  Production  Programs),  Caddy  Energy  (Consultancy  for
CBM  development  and economics), and many others

----------------------------------------------------

Joint Convention Medan 2013 (JCM 2013)

The 38th HAGI and 42nd IAGI Annual Convention & Exhibition

Register Now! http://www.jcm2013.com/registration/

----------------------------------------------------

Visit IAGI Website: http://iagi.or.id

Hubungi Kami: http://www.iagi.or.id/contact

----------------------------------------------------

Iuran tahunan Rp.250.000,- (profesional) dan Rp.100.000,- (mahasiswa)

Pembayaran iuran anggota ditujukan ke:

Bank Mandiri Cab. Wisma Alia Jakarta

No. Rek: 123 0085005314

Atas nama: Ikatan Ahli Geologi Indonesia (IAGI)

Bank BCA KCP. Manara Mulia

No. Rekening: 255-1088580

A/n: Shinta Damayanti

----------------------------------------------------

Subscribe: [email protected]

Unsubscribe: [email protected]

----------------------------------------------------

DISCLAIMER: IAGI disclaims all warranties with regard to information 

posted on its mailing lists, whether posted by IAGI or others. 

In no event shall IAGI or its members be liable for any, including but not 
limited

to direct or indirect damages, or damages of any kind whatsoever, resulting 

from loss of use, data or profits, arising out of or in connection with the use 
of 

any information posted on IAGI mailing list.

----------------------------------------------------

Kirim email ke