Mans Yanto, Ini Sumartojo ikut-ikutan menjawab pertanyaan anda tentang serpih minyak. Yang saya baca di lampiran email anda mereka menggunakan teknologi "fluidized bed", jadi serpih nya tidak diproses menjadi minyak dulu, seperti proses yang menggunakan batubara.
Salam, Jojok Sent from my iPad > On Mar 22, 2016, at 21:10, Yanto R. Sumantri - [email protected] > <[email protected]> wrote: > > > Apakah pada pltl dibawah ini oil shale yg dipakai sudah berbentuk oil atau > proses oil shale menjadi oil dilakukan dipltl tsb. > Just curious. > > si Abah > > > > Attarat Power Plant > From Wikipedia, the free encyclopedia > Attarat Power Plant > Country > Jordan > Location > Attarat Um Ghudran > Status > Proposed > Commission date > 2019 (expected) > Owner(s) > Eesti Energia > YTL Power International > Near East Investments > Operator(s) > Attarat Power Company > Thermal power station > Primary fuel > Oil shale > Power generation > Make and model > Siemens > Units planned > 2 x 235 MW > Nameplate capacity > 470 MW > Attarat Power Plant is a planned oil shale-fueled power plant in the Attarat > Um Ghudran area in Jordan. The concession agreement between the Ministry of > Energy and Mineral Resources and National Electricity Power Companyof Jordan, > and Estonian power company Eesti Energia (Enefit) was signed on 30 April > 2008.[1][2] The project is developed in the partnership with YTL Power > International and Near East Investments of Jordan, and will be operated by > Attarat Power Company.[3][4] > The power plant will have a total capacity of 470 MW.[5][6] It will consist > of two circulating-fluidized-bed units.[7] Theengineering, procurement and > construction contract was awarded to Guangdong Power Engineering Corporation, > a subsidiary of China Energy Engineering Group. The power plant would be > designed by WorleyParsons. It would use boilers provided by Foster Wheeler > and the turbine by Siemens.[8] The project will be cost US$1.6 billion[5][6] > and will be financed by $1.4 billion loan provided by the Bank of China and > the Industrial and Commercial Bank of China, and guaranteed by China Export > and Credit Insurance Corporation.[6][8] > A 30-year power purchase agreement was signed with Jordan in October 2014.[9] > The construction agreement was signed on 12 January 2016.[5] The plant is > expected to start operation in the second half of 2019.[5][6] When > constructed, it will be among the largest power plants in Jordan (the largest > being Aqaba Thermal Power Station), and the largest oil shale-fired power > plant in the world after Narva Power Plants in Estonia.[10][11][12] > The power plant would consume 10 million tons of oil shale per year.[7] Over > its 40-year lifetime it would need an oil-shale mining area of approximately > 11 square kilometres (4.2 sq mi).[4] > > > > ---------------------------------------------------- > > Geosea XIV and 45TH IAGI Annual Convention 2016 > Bandung , October 10-13 2016 > for further information please visit our website at > http://geosea2016.iagi.or.id or email to [email protected] > > ---------------------------------------------------- > > Iuran tahunan Rp.250.000,- (profesional) dan Rp.100.000,- (mahasiswa) > Pembayaran iuran anggota ditujukan ke: > Bank Mandiri Cab. Wisma Alia Jakarta (a/n IAGI) > No. Rek: 123 0085005314 > Bank BCA KCP. Manara Mulia (A/n: Shinta Damayanti) > No. Rekening: 255-1088580 > > ---------------------------------------------------- > Subscribe: [email protected] > Unsubscribe: [email protected] > ---------------------------------------------------- > DISCLAIMER: IAGI disclaims all warranties with regard to information > posted on its mailing lists, whether posted by IAGI or others. > In no event shall IAGI or its members be liable for any, including but not > limited > to direct or indirect damages, or damages of any kind whatsoever, resulting > from loss of use, data or profits, arising out of or in connection with the > use of > any information posted on IAGI mailing list. > ---------------------------------------------------- Geosea XIV and 45TH IAGI Annual Convention 2016 Bandung , October 10-13 2016 for further information please visit our website at http://geosea2016.iagi.or.id or email to [email protected] ---------------------------------------------------- Iuran tahunan Rp.250.000,- (profesional) dan Rp.100.000,- (mahasiswa) Pembayaran iuran anggota ditujukan ke: Bank Mandiri Cab. Wisma Alia Jakarta (a/n IAGI) No. Rek: 123 0085005314 Bank BCA KCP. Manara Mulia (A/n: Shinta Damayanti) No. Rekening: 255-1088580 ---------------------------------------------------- Subscribe: [email protected] Unsubscribe: [email protected] ---------------------------------------------------- DISCLAIMER: IAGI disclaims all warranties with regard to information posted on its mailing lists, whether posted by IAGI or others. In no event shall IAGI or its members be liable for any, including but not limited to direct or indirect damages, or damages of any kind whatsoever, resulting from loss of use, data or profits, arising out of or in connection with the use of any information posted on IAGI mailing list.

