thanks Bill.
jan

>----- Oorspronkelijk bericht -----
>Van : Bill Fairchild [mailto:[email protected]]
>Verzonden : donderdag , september 3, 2009 04:03 PM
>Aan : [email protected]
>Onderwerp : Re: What happens in a DS8000 Metro Mirror (PPRC-Sync) config when 
>the relationship between a volume pair is broken?
>
>My comments were based on my experience with a 9390 model 6 control unit. I 
>don't know what the exact mapping is on a DS8000.
>
>Bill Fairchild
>
>Software Developer
>Rocket Software
>275 Grove Street * Newton, MA 02466-2272 * USA
>Tel: +1.617.614.4503 * Mobile: +1.508.341.1715
>Email: [email protected]
>Web: www.rocketsoftware.com
>
>
>-----Original Message-----
>From: IBM Mainframe Discussion List [mailto:[email protected]] On Behalf Of 
>Jan Vanbrabant
>Sent: Wednesday, September 02, 2009 2:50 PM
>To: [email protected]
>Subject: Re: What happens in a DS8000 Metro Mirror (PPRC-Sync) config when the 
>relationship between a volume pair is broken?
>
>Hi Bill, thanks!
>Re. <<<PPRC uses one bit to represent a whole cylinder. So if only a single 
>bit is changed in only one track in cylinder X, then bit X is turned on, which 
>later will require the copying of all 15 tracks on cylinder X. If a fully 
>populated EAV is ever available in beaucoup years from now, it will have 16 to 
>the 7th power cylinders (ca. 268 million), and it will need the same number of 
>bits, which is 33.5 million bytes. Maybe by then each bit will represent 1,000 
>cylinders. >>>
>
>Is the bitmap on cylinder level, or on track level?
>SG24-6787-04 DS8000 Copy Services for IBM System z (6 Februari 2009)
>pag. 213 paragraph 15.2? Volumes are in the suspended state when the primary 
>and secondary storage subsystems cannot communicate anymore, or when the Metro 
>Mirror pair is suspended manually. In this state, writes to the primary volume 
>are not mirrored onto the secondary volume. The secondary volume becomes 
>out-of-sync. During this time, Metro Mirror keeps a bitmap record of the 
>changed tracks in the primary volume. Later, when the volumes are 
>re-synchronized, only the tracks that were updated will be copied.
>Thruout the redbook at several places, it's always tracks who are mentioned in 
>relationship with the bitmap.
>???
>Jan
>
>
>
>
>----------------------------------------------------------------------
>For IBM-MAIN subscribe / signoff / archive access instructions,
>send email to [email protected] with the message: GET IBM-MAIN INFO
>Search the archives at http://bama.ua.edu/archives/ibm-main.html
>
>----------------------------------------------------------------------
>For IBM-MAIN subscribe / signoff / archive access instructions,
>send email to [email protected] with the message: GET IBM-MAIN INFO
>Search the archives at http://bama.ua.edu/archives/ibm-main.html
>
>


----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to