On 6/30/2010 6:34 AM, Shmuel Metz (Seymour J.) wrote:
The intrinsic problem is that to do it correctly (for a PDS) the
program needs to be authorized, as DS1NOBDB needs to be reset.
Doesn't CLOSE update it from the DCB?
The approaches posted previously all treated the directory as
sequential. AFAIK, the DS1NOBDB field is not altered unless a
STOW is issued. And it would be interesting to determine whether
the common practice of updating a PDS with a primary ENQ of SHR
has led IBM to add format 1 updates to the STOW logic.
Gerhard Postpischil
Bradford, VT
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html