On Sun, 4 Jul 2010 17:42:16 -0400 "Robert A. Rosenberg" <[email protected]>
wrote:

:>At 11:40 PM +0300 on 7/4/10, Binyamin Dissen wrote about Re: ecb 
:>paramter on Attach:

:>>On Sun, 4 Jul 2010 16:21:31 -0400 Joe Reichman <[email protected]>
:>>wrote:

:>>:>Just to clarify the ECB= parameter on the Attach

:>>:>Is posted when the Main Task does a DETACH

:>>I don't know, but I don't think so.

:>>But if you are DETACHing, why do you need to check the ECB?

:>To insure that the ATTACHed Task has completed. 

That wasn't the question.

The question was "Just to clarify the ECB= parameter on the Attach. Is posted
when the Main Task does a DETACH".

Thus he has already made the decision to DETACH and wants to know what may
happen.

:>                                                If you DETACH without 
:>the ECB being posted, that means that the ATTACHed task is still 
:>running thus causing the task to be ABENDed (which can mess up 
:>whatever it is doing such as File I/O).

--
Binyamin Dissen <[email protected]>
http://www.dissensoftware.com

Director, Dissen Software, Bar & Grill - Israel


Should you use the mailblocks package and expect a response from me,
you should preauthorize the dissensoftware.com domain.

I very rarely bother responding to challenge/response systems,
especially those from irresponsible companies.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to