In <listserv%[email protected]>, on 07/01/2011
at 03:33 PM, Tom Marchant <[email protected]> said:
>LINK is an SVC and the linked program runs under control of an SVRB.
No; SVC 6 creates a PRB for the linked program, and exits before the
PRB receives control.
>The SVC will delete the SVRB
The SVRB is freed before the linked program gets control. The SVC 3
from the linked program deletes the PRB.
--
Shmuel (Seymour J.) Metz, SysProg and JOAT
ISO position; see <http://patriot.net/~shmuel/resume/brief.html>
We don't care. We don't have to care, we're Congress.
(S877: The Shut up and Eat Your spam act of 2003)
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html