Only one CDE 

The TCB is just a control block that keeps track of ownership of resources
storage,  modules loaded, in the case of DB2 which DB2 SSID is associated
with task
Also generated with a certain storage key TCBPKF as to what storage key it
can access of course this can be changed by modeset

Just wondering if I got it right


thanks 


-----Original Message-----
From: IBM Mainframe Discussion List [mailto:[email protected]] On Behalf
Of Binyamin Dissen
Sent: Sunday, January 01, 2012 3:21 PM
To: [email protected]
Subject: Re: Control Blocks Generated By Attach

On Sun, 1 Jan 2012 15:09:01 -0500 Micheal Butz <[email protected]>
wrote:

:>If I do 4 attaches to the same program then there will be only one copy of
:>the program 

If RENT.

:>But each TCB will have its own set of RB's indicating where each  task is
to
:>resume processing

Yes.

In fact, ATTACH terminates before the module is loaded. The LOAD is done by
the new task. 

--
Binyamin Dissen <[email protected]>
http://www.dissensoftware.com

Director, Dissen Software, Bar & Grill - Israel


Should you use the mailblocks package and expect a response from me,
you should preauthorize the dissensoftware.com domain.

I very rarely bother responding to challenge/response systems,
especially those from irresponsible companies.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to